BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesBrandPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsConstruction of a Multi-Purpose Sports Facility - School Gymnasium in Lišov
    Closed contract

    Construction of a Multi-Purpose Sports Facility - School Gymnasium in Lišov

    Contract value
    CZK 166.3m
    Closed 16 Sept 2025

    This public procurement contract involves the demolition of the old gymnasium at the Lišov Primary School and the subsequent construction of a new modern gymnasium with appropriate operational and sanitary facilities on the site of the original gym. The need for a larger gym arises from the requirem

    🇨🇿Czech RepublicPublished 17 Aug 2025· 1 years agoviaTED
    Contract value
    CZK 166.3m
    Closed 16 Sept 2025
    Tender deadline passed on 16 Sept 2025.

    Decision brief

    4 fields
    • Contract value
      est.CZK 166,347,000
      CZK
    • Tender closed
      16 Sept 2025
      1 years ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇨🇿Czech Republic

    Lifecycle

    Closed

    Tender closed on 16 Sept 2025. Awaiting award.

    17 Aug 2025Today16 Sept 2025

    Brief

    This public procurement contract involves the demolition of the old gymnasium at the Lišov Primary School and the subsequent construction of a new modern gymnasium with appropriate operational and sanitary facilities on the site of the original gym. The need for a larger gym arises from the requirement for a playing area that meets competitive standards for floorball and handball, with an optimal hall size of 45.0 x 24.0 meters. The new gym building is designed as a simple rectangular structure with external dimensions of 28.7 x 61.6 meters and a height of approximately 11.25 meters above the clean floor level of the first floor, with an expected roof ridge height of about 12.50 meters. The construction will be made of monolithic reinforced concrete, which will also serve as a visible material, complemented by light natural wood and a color combination of white, gray, and black, accented with bright yellow. The exterior will have a minimalist design, featuring a horizontal division with a concrete base partially embedded in the ground and a visually light facade made of a prefabricated metal structure. The building will be functionally divided into two parts: the southern entrance section, which is three stories high, includes entry and communication areas, changing rooms for athletes and coaches, sanitary facilities for visitors, and technical spaces. The northern part is dedicated to the gymnasium, which is open to the full height of the building. The main entrance is located at the southeast corner of the building, leading from a semi-enclosed outdoor space. The entrance hall connects all three floors via a main staircase and an elevator. The southern facade features a dirty corridor providing access to individual changing room modules. The first floor includes two blocks of physical education rooms and two blocks of changing rooms for athletes, while the second floor has four blocks of changing rooms, each with its own sanitary facilities. The clean corridor leads to the gymnasium, and there is an existing connecting corridor to the operational area of the school. On the third floor of the southern section, there are sanitary facilities for visitors, and a separate corridor provides access to technical spaces for air conditioning, heat and smoke extraction, and water heating. The gymnasium hall is the dominant space in the building, occupying about two-thirds of the northern part. The second floor features a three-tiered spectator gallery on the southern and western sides. Under the gallery, there are storage rooms, emergency restrooms with showers (accessible), technical rooms (backup battery source), and storage areas. An external emergency staircase is attached to the northern side of the building for evacuating spectators from the gallery. Further details are provided in Appendix 1 - Project Documentation, including a bill of quantities. The contracting authority anticipates that the construction will be financed from the Operational Program for the Environment (OPŽP) and the National Sports Agency (NSA). The contracting authority reserves the right to cancel the procurement process if funding from the aforementioned sources is not obtained.

    More from LIOV CITY

    1 listingView all →
    AwardedEducation & Training🇨🇿Czech Republic

    School Furniture Supply for Lišov Elementary School

    This public contract involves the supply and installation of interior furnishings for specialized classrooms and the school club at the newly constructed extension of Lišov Elementary School. The required items include tables, chairs, teacher desks, cabinets, and other furniture along with accessori

    CZK 1,235,424LIOV CITY
    Published 3 Jun 2025

    Open in Construction

    4 open listingsView all →
    Construction🇮🇪Ireland

    Ireland – Fire Door Repairs and Maintenance Program

    Ireland is seeking qualified suppliers to repair existing fire doors and perform annual inspection and maintenance services.

    est.€400,000Beaumont Hospital
    Published 18 Sept 2026
    OpenConstruction🇮🇪Ireland

    Construction of Riverine Community Park with Cycle and Pedestrian Bridge in Ireland

    Construction of a new 120m cycle and pedestrian bridge and integrated community park facilities across the River Foyle in Lifford and Strabane, Ireland.

    €12,000,000indicativeDonegal County Council
    Published 18 Sept 2026
    Construction🇮🇪Ireland

    Steel Footbridge Construction Over Owenriff River at N59 Oughterard

    Construction of a new steel footbridge over the Owenriff River at N59 Oughterard with access ramps, boundary walls, utilities relocation, and landscaping.

    est.€22,000,000GALWAY COUNTY COUNCIL
    Published 18 Sept 2026
    Construction🇮🇪Ireland

    Coastal Protection Works at Kilpatrick, Ireland

    Construction of 80m of rock armour coastal defence works with access track and culvert refurbishment in Kilpatrick, Ireland.

    WEXFORD COUNTY COUNCIL
    Published 18 Sept 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    535307-2025
    LC
    Buyer
    LIOV CITY
    Sector
    Construction