This contract opportunity involves conducting studies for the reliability program of the Val d'Authion flood control system. It is divided into two lots: Lot 1 focuses on project management for strengthening the Belle Poule section of the dike, which is part of the Val d'Authion flood control system
Tender closed on 26 Sept 2025. Awaiting award.
Only 1 prior award here — too little to read.
In engineering, PUBLIC ESTABLISHMENT LOIRE has awarded 1 contract to 1 supplier.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This framework agreement is for the removal and disposal of floating waste and waste deposited on the banks of the reservoir. Suppliers are invited to provide services related to the collection and evacuation of waste in designated areas. The goal is to maintain cleanliness and environmental standar
This contract is part of the PEP Montluçon Cher amont project and involves conducting a hydraulic study to assess flood risks associated with the overflow of the Marmande River. The study will consider the influence of the Berry Canal and evaluate various potential development scenarios. Suppliers a
This contract involves actions aimed at reducing the vulnerability of people and property in flood-prone areas. It focuses on three specific areas: the Loir River, the middle and lower Cher River, and the upper Cher River near Montluçon. The goal is to conduct vulnerability assessments for various t
Design and construction contract for landslip repair works including retaining wall, road reconstruction, and earthworks at Chesterfield Road, Beeley, Derbyshire.
Kirklees Council is seeking construction contractors and subcontractors via a Dynamic Purchasing System framework worth £154 million for repair and maintenance services.
FCDO is conducting preliminary market engagement for a 998 sqm office fit-out project at the new Deputy High Commission in Mumbai, targeting award in April 2027 and completion in February 2028.
Complete refurbishment of two hospital WC facilities and ground-floor corridor flooring, including sanitaryware replacement, safety flooring installation and all associated mechanical, electrical and plumbing works.