This contract involves roofing, insulation, and plumbing works to be carried out in two phases: first, new construction, followed by the renovation of existing structures. Suppliers should note that there will be a significant time difference between these two phases.
Contract awarded. Originally published 9 months ago.
This contract involves scaffolding work to be carried out in two phases: first, the construction of new buildings, followed by the renovation of existing structures. It is important to consider a significant time difference between these two phases.
This contract involves construction work for school buildings, divided into two phases: first, the new construction of the buildings, followed by the renovation of existing structures. Suppliers should note that there will be a significant time gap between these two phases. The total value of the co
The contract involves the installation of various plumbing and heating systems. Key components include: 262 meters of wastewater piping, 496 meters of drinking water piping, 82 free-flow angled seat valves, 19 compact wall-mounted toilets, 18 sinks, 14 single-lever basin mixers, 50 installation syst
Flat roof refurbishment project at Killeigh National School requiring new EPDM membrane, insulation, and replacement of 36 rooflights across approximately 393 square meters.
Tender for science laboratory upgrades including gas systems, building services, furniture, and finishes at an Irish secondary school.
Dublin City Council seeks a contractor for the Finglas Village Improvement Scheme to enhance active travel infrastructure and public amenities in the village center.
Qualification system for civil and associated works contractors on siteworks projects in Ireland, with requirements detailed in a two-volume Qualification Information Document.