The project involves redesigning the outdoor areas between existing building 2b (Interim Daycare Steinstraße) and Maxstraße. This includes creating a landscaped area with terraces, planting, fencing, and a new access path to the building (paving work). Key tasks include: 1. Site preparation: - Setti
Tender closed on 16 Sept 2025. Awaiting award.
Only 2 prior awards here — too little to read.
In construction, CITY OF BAD KISSINGEN has awarded 2 contracts to 2 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
The City of Bad Kissingen is seeking suppliers to provide cleaning services, including regular maintenance cleaning, deep cleaning, and window cleaning for various municipal properties. This contract aims to ensure that all facilities are kept in a clean and hygienic condition, contributing to the o
The planned construction project involves the replacement and new construction of a four-stream primary school with a sports hall and all-day care. Extensive land leveling and filling are required on the site. The building is primarily designed as a single-story structure that adapts to the natural
The Bad Kissingen wastewater treatment plant currently relies on a combined heat and power (CHP) system and a heating boiler, both of which can operate on biogas and natural gas. In the future, the CHP will only be used at night when there is no solar power available, and the use of natural gas will
The City of Bad Kissingen is seeking suppliers for the installation of a photovoltaic (PV) ground-mounted system with a capacity of 999 kWp near the Bad Kissingen wastewater treatment plant. This system aims to generate energy to meet the electricity needs of the treatment plant and will be integrat
Opportunity to design and fitout the British Council's Penang office with reconfigured layout and new examination facilities.
Appoint a multidisciplinary design team to develop decarbonisation solutions for Historic England's national archive in Swindon through RIBA Stage 3, supporting net-zero targets by 2040.
Structural lintel replacement and lime render renewal for a heritage property in Maryport's conservation area.
Single contractor required to design and build 28 affordable homes with community facilities and football pitch in Solva, Pembrokeshire.