    ContractsCzech Republic – Cogeneration Unit for Wastewater Treatment Plant in Tábor Klokoty
    Closed contract

    Czech Republic – Cogeneration Unit for Wastewater Treatment Plant in Tábor Klokoty

    Contract value
    CZK 25.7m
    Closed 15 Sept 2025

    This public procurement contract involves the supply, installation, and commissioning of a new cogeneration unit (KGJ) in an outdoor setting (the machine will be housed in a steel container). The installation requires the construction of a cable connection between the upper and lower areas of the wa

    🇨🇿Czech RepublicPublished 13 Aug 2025· 1 years agoviaTED
    Contract value
    CZK 25.7m
    Closed 15 Sept 2025
    Tender deadline passed on 15 Sept 2025.

    Decision brief

    4 fields
    • Contract value
      est.CZK 25,718,000
      CZK
    • Tender closed
      15 Sept 2025
      11 months ago
    • Sector
      Energy & Utilities
      Browse related listings
    • Location
      🇨🇿Czech Republic

    Lifecycle

    Closed

    Tender closed on 15 Sept 2025. Awaiting award.

    13 Aug 2025Today15 Sept 2025

    Brief

    This public procurement contract involves the supply, installation, and commissioning of a new cogeneration unit (KGJ) in an outdoor setting (the machine will be housed in a steel container). The installation requires the construction of a cable connection between the upper and lower areas of the wastewater treatment plant (ČOV). Alongside the new electrical cables, the existing old drinking water pipes connecting the upper and lower areas will be replaced. Additionally, the sludge discharge from the lower to the upper area will be rehabilitated, and part of the gravity pipeline from the upper to the lower area will also be rehabilitated. The replacement of the sewage pipeline and sludge discharge will not be done through open excavation but will be carried out using trenchless rehabilitation methods within the existing pipeline. The contract also includes the preparation of a proposal to supplement the operational regulations of the Klokoty wastewater treatment plant, ensuring communication with EG.D and the future operator, providing documentation, and submitting a request for a binding opinion to the air protection authority before the completion of the construction, as well as ensuring a trial operation period of 12 months, including noise measurement. Warranty and post-warranty service for the KGJ will be provided for 5 years based on a service contract between the supplier/manufacturer of the KGJ and the operator ČEVAK a.s. For more details, see the tender documentation.

    More from TABOR WATER COMPANY LTD

    1 listingView all →
    Construction🇨🇿Czech Republic

    Construction of Water and Sewer Systems in Tábor – Stoklasná Lhota

    This public procurement contract involves the construction project titled 'Tábor – Stoklasná Lhota, Water Supply and Sewerage'. The project includes the development of a new sewage system, which consists of a wastewater treatment plant (WWTP) and a new water supply system, including a water reservoi

    est.CZK 127,000,000TABOR WATER COMPANY LTD
    Published 29 Apr 2025

    Open in Energy & Utilities

    4 open listingsView all →
    Energy & Utilities🇬🇧United Kingdom

    Multi-Site Solar PV Installations for Gwynedd Council

    Gwynedd Council seeks suppliers to design, supply, and install grid-connected solar PV systems across 11 properties.

    est.£14,000,000Cyngor Gwynedd
    Published 21 Aug 2026
    Energy & Utilities🇬🇧United Kingdom

    City College Plymouth – Energy Supply Tender (Electricity & Gas)

    City College Plymouth is tendering for reliable electricity and gas suppliers to serve their multi-site campus with competitive pricing and strong sustainability commitment.

    est.£2,715,000CITY COLLEGE PLYMOUTH
    Published 21 Aug 2026
    OpenEnergy & Utilities🇬🇧United Kingdom

    Solar Panel Installation at West Ham Shop

    Install a 99kW rooftop solar panel system on the West Ham shop with inverters and electrical connections to the stadium network.

    £371,000indicativeLondon stadium
    Published 21 Aug 2026
    Energy & Utilities🇮🇪Ireland

    Rooftop Solar PV Systems Framework for Galway County Council

    Galway County Council seeks a framework supplier for the design, installation, and maintenance of rooftop solar PV systems across their facilities.

    GALWAY COUNTY COUNCIL
    Published 21 Aug 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    533039-2025
    TW
    Buyer
    TABOR WATER COMPANY LTD
    Sector
    Energy & Utilities