This public contract is for the provision of winter maintenance services for secondary and tertiary roads in the South Moravian Region. The work includes salting, snow plowing, and monitoring of road conditions. The contract covers various operational areas managed by different road maintenance depa
Tender closed on 11 Sept 2025. Awaiting award.
This contract involves the preparation of project documentation for the construction phase, including a work list. It also includes the evaluation of the author's supervision during the implementation of the project. The documentation focuses on the reconstruction of several road sections, including
This contract involves the installation, rental, maintenance, and cleaning of snow barriers along a total length of 28,710 linear meters on roads in the South Moravian Region. The height of the installed snow barriers must be at least 120 cm. The recommended dimensions for the wooden barriers are a
This public procurement contract involves the supply of road salt for the contracting authority as part of an established dynamic purchasing system for summer pre-supply of road salt. Suppliers are invited to provide road salt to meet the needs of the South Moravian Region's Road Administration. The
This public procurement contract involves construction work for a new road (II/416) located north of the village of Blučina. The total length of the construction is 4,475 meters, situated entirely in the rural area. The project includes the construction of a bypass around Blučina, featuring a new ro
Teesside International Airport is recruiting a taxi service provider to deliver passenger ground transportation with guaranteed 15-minute maximum wait times and future hydrogen vehicle capability.
Doncaster Council seeks two ranked suppliers for a 48-month framework agreement to provide heavy commercial vehicle parts and consumables with estimated annual spend of £50,000.
Southern Water seeks fuel card services for a 1200-vehicle fleet with annual fuel costs of £2 million.
Translink seeks suppliers to provide and install a replacement Brush Box assembly and high-pressure water Dust Suppression System for railway ballast regulators, including full installation and technical support for a 12-month contract with possible extensions.