PLINACRO DOO
This contract involves the construction of a main gas pipeline from Bosiljevo to Sisak, with a diameter of 800/100 mm, using a 'turnkey' approach. The work includes various construction activities such as civil engineering, mechanical assembly, welding, electrical and instrumentation work, cathodic
AwardedConstruction🇭🇷CroatiaPublished 25 Aug 2025
€146,953,800
PLINACRO DOO
This contract involves the construction of a main gas pipeline from Kozarac to Sisak, with a diameter of DN 800/100, using a 'turnkey' approach. The work includes various construction activities such as civil engineering, mechanical assembly, welding, electrical and instrumentation work, cathodic pr
AwardedConstruction🇭🇷CroatiaPublished 9 Jun 2025
€34,983,508
PLINACRO DOO
This contract involves the supply of electricity in accordance with the Technical Specification / Cost Estimate and the General Conditions for Network Use and Electricity Supply. The supplied electricity must contain at least 50% from renewable sources. This requirement aims to stimulate the product
ClosedEnergy & Utilities🇭🇷CroatiaPublished 1 Jun 2025
est.€1,200,000Deadline 25 Jun 2025
PLINACRO DOO
This contract involves the supply, commissioning, and maintenance of gas equipment for UMS Sisak (INA Biometan). The estimated scope and quantity of the procurement are detailed in the Technical Specification/Cost Estimate, which is part of this procurement documentation. The work includes providing
AwardedEnergy & Utilities🇭🇷CroatiaPublished 29 May 2025
€739,144