This contract involves the development, implementation, and dissemination of a hydrological alert protocol between state and regional administrations. It aims to integrate this protocol into civil protection plans for flood risks at both state and regional levels. Additionally, the project includes
Contract awarded. Originally published 9 months ago.
Procurement for specialized consultancy services covering assets and investments advisory, strategy, and management.
Opportunity to design and construct a new 4.8 MW electrical substation on Eady island in Orkney.
Royal Artillery Museum seeks an experienced Quantity Surveyor consultant to support the development and delivery of a new sustainable museum project in Wiltshire through RIBA design stages 2-7.
Design and construction of a 2,037-meter foul sewer system with pumping station and Anglian Water connection at High Lodge.