This contract involves construction work for the project titled 'Yacht Port in Świnoujście - Replacement of Floating Pier System.' The work includes replacing the existing concrete and wooden floating piers anchored with chains and dead weights at the Jerzy Porębski Yacht Port (Northern Basin) with
Tender closed on 9 Sept 2025. Awaiting award.
The contract involves providing comprehensive insurance services for the City of Świnoujście. This includes two main parts: Part I focuses on property and liability insurance, covering all risks, theft, and damage to property, as well as electronic equipment and general liability insurance. Part II
This contract involves the provision of cleaning and sanitation services for the Municipality of Świnoujście. The work is divided into four parts: 1) Cleaning services on the right bank, including mechanical and manual street sweeping, maintenance of green areas, waste collection, and cleaning durin
This contract involves serving as the contract engineer for the supervision of a construction project, specifically the design and construction of a brackish water treatment plant in Świnoujście, along with the necessary infrastructure. The role includes overseeing compliance with construction law,
This contract involves the provision of cleaning and sanitation services for urban and rural areas in Świnoujście. The work is divided into four parts: 1) Cleaning services on the right bank, including mechanical and manual street sweeping, maintenance of green areas, waste container management, and
Stotfold Town Council seeks experienced contractors to renovate the cemetery toilet block, adding compliant facilities, solar heating, and storage within a £190,000-£210,000 budget.
Construction of an adapted ground floor cloakroom and WC facility for a vulnerable tenant at a Blyth residential property, scheduled to begin November 2026 over 14 weeks.
Design-and-build glazed envelope and structural steelwork renewal for the Grade II listed Barbican Arts Centre, including new glazing systems, steel framing, and façade access solutions across multiple building sections.
EKFB requires a subcontractor for trial installation of access stairs and hard landscaping at Claydon Road Overbridge, with potential for future phases if successful.