This public procurement contract is for the purchase and delivery of safety helmets and their accessories. The safety helmets will be used to protect operational personnel while performing tasks in the electrical substations and during work on the transmission power lines. The head-mounted LED lamp
Tender closed on 9 Sept 2025. Awaiting award.
This contract involves the design of a 110 kV substation named 'Beshovitsa' to connect the solar power plant 'Elidis Solar' and the associated electrical network, owned by 'ESP Elidis Solar Park' LLC. The contract also includes author supervision during the construction phase.
This public procurement contract is for providing insurance services for a duration of 48 months. The services include liability insurance for motorists, comprehensive insurance (Kasko), and accident insurance for vehicles, including motor vehicles, road vehicles, and specialized equipment owned by
This contract involves the procurement of approximately 2,970 voltage measuring transformers for medium voltage applications. The breakdown of the required transformers is as follows: 30 units of 7.2 kV transformers for indoor installation, with a transformation ratio of 6000/√3:100/√3:100/√3:100/3
This contract involves the execution of author supervision and, if necessary, the execution of geodetic surveys and the preparation of executive documentation for the project "Construction of a sewer system for the "Septemvriitsi" 110/20 kV substation." The project aims to ensure proper infrastructu
Procurement and installation of a fibre laser cutter to enhance manufacturing productivity and reduce costs for defence programme support.
Submit your manufacturing capabilities and expertise for components and assemblies through the Atamis RFI portal.
Seeking manufacturing SMEs to join a framework agreement for supplying components and assemblies through the Atamis portal.
Supply and installation of a factory-built Adiabatic Compressed Air Energy Storage demonstrator plant meeting specified performance requirements for delivery by June 2028, with a budget of up to £1.6 million.