This contract is for the supply of magnesium chloride solution for winter road maintenance during the 2025-2026 season. It includes two lots: Lot 1 for the Magdeburg branch and Lot 2 for the Dresden branch. Suppliers are invited to submit bids for one or both lots. The total value of the contract is
Tender closed on 29 Aug 2025. Awaiting award.
This contract involves construction supervision services for the A38 project, specifically for the section between Lützen and Leipzig-Südost. The work includes two lots: Lot 1 focuses on construction management and oversight, while Lot 2 involves safety coordination. Suppliers are invited to provide
This contract involves local construction supervision services for the repair of operational technology as part of the renovation of the Schmücke Tunnel. The services required fall under the categories of technical equipment and include phases 8-9 of the construction supervision process. The total v
This contract involves construction services for the complete renewal of the A 38 highway, specifically from kilometer 178+000 to kilometer 185+535, as part of the second construction phase. The work is being managed by Die Autobahn GmbH des Bundes - NL Ost and is valued at approximately €12,570,294
This contract involves the installation of vehicle restraint systems (guardrails) along the A 38 highway, specifically between kilometers 201.3 and 208.3, in the Dresden region. The project is part of a larger construction effort managed by Die Autobahn GmbH des Bundes - NL Ost. Suppliers are invite
Teesside International Airport is recruiting a taxi service provider to deliver passenger ground transportation with guaranteed 15-minute maximum wait times and future hydrogen vehicle capability.
Doncaster Council seeks two ranked suppliers for a 48-month framework agreement to provide heavy commercial vehicle parts and consumables with estimated annual spend of £50,000.
Southern Water seeks fuel card services for a 1200-vehicle fleet with annual fuel costs of £2 million.
Translink seeks suppliers to provide and install a replacement Brush Box assembly and high-pressure water Dust Suppression System for railway ballast regulators, including full installation and technical support for a 12-month contract with possible extensions.