This contract involves plastering work at Grand-Pré College in Prilly, Switzerland. The project includes the installation of lightweight partitions and linings to ensure acoustic and thermal insulation. Key details include: - Installation of double plasterboard partitions with sound insulation made
Contract awarded. Originally published 11 months ago.
This contract involves the construction of furniture, partially using reused materials, as well as new wooden paneling and an increase in the height of a parapet, which includes a handrail. Suppliers are invited to provide their services for this renovation project, which aims to enhance the functio
This contract involves the repair of concrete surfaces, including the application of Minergie Eco mortars and treatment of wolf jumps. Please note that the work does not include retaining walls. The total value of the contract is approximately 289,668 CHF. This opportunity is published on the TED pl
This contract involves preparing and organizing the construction site for the Grand-Pré College in Prilly, Switzerland. Key tasks include setting up secure storage areas, installing temporary restrooms, and ensuring safe access to the site. The project will involve creating concrete walls, reinforci
This contract involves a complete renovation of both high and low voltage electrical installations at Grand-Pré College. Key tasks include replacing existing wiring, upgrading electrical panels to meet current standards, installing LED lighting fixtures, and integrating modern solutions such as smar
Roof replacement and solar PV installation project covering five residential streets in Penparcau, Aberystwyth, including fascias, soffits, and insulation work.
Contract to deliver void management, kitchen and bathroom installation, and property adaptations with compliance to Decent Homes Standards and sustainability requirements.
Conduct electrical installation testing, remedial repairs, and certification for domestic and communal properties under a 5-year compliance programme with sustainability and social value commitments.
Kier Infrastructure invites qualified contractors to bid for FRC precast and in situ concrete works on the M6 Lune Gorge Roundthwaite Box project near Junction 38.