    ContractsRenovation of Friedrich Schiller State Primary School in Zella-Mehlis
    Awarded contract

    Renovation of Friedrich Schiller State Primary School in Zella-Mehlis

    Status
    Awarded
    Published 24 Jul 2025

    The Schmalkalden-Meiningen district intends to renovate the Friedrich Schiller State Primary School in Zella-Mehlis. The school building was constructed in 1913, with an extension added in 1960 and a workshop building completed in 1977. The main building has a three-story structure, including a base

    🇩🇪GermanyPublished 24 Jul 2025· 1 years agoviaTED
    Status
    Awarded
    Published 24 Jul 2025

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Closing date
      Rolling
      No closing date published
    • Sector
      Construction
      Browse related listings
    • Location
      🇩🇪Germany

    Suppliers

    5 suppliers
    • AR
      Architekturbüro bgs Gössinger + Scharfenberg
    Lead contractor
  1. AB
    ARCHITEKTURBRO BGS GSSINGER SCHARFENBERG
    Lead contractor
  2. HZ
    Henneker Zillinger Beratende Ingenieure Leipzig PartG mbB
    Consortium partner
  3. EP
    E+P ENGINEERS GmbH & Co.KG Planning Office for Building Technology
    Consortium partner
  4. GS
    GBI SOCIETY OF CONSULTING ENGINEERS LTD
    Consortium partner
  5. Lifecycle

    Awarded

    Contract awarded. Originally published 1 years ago.

    24 July 2025
    Awarded — no open tender advertised

    Brief

    The Schmalkalden-Meiningen district intends to renovate the Friedrich Schiller State Primary School in Zella-Mehlis. The school building was constructed in 1913, with an extension added in 1960 and a workshop building completed in 1977. The main building has a three-story structure, including a basement, ground floor, first and second floors, and an unfinished attic. The building features a solid construction with reinforced concrete ceilings supported by walls. The staircases are made of granite steps with metal railings. The upper part of the stairwells has a concrete ceiling topped with a gabled roof. The roof structure is made of wooden beams covered with tiles. The building has mostly plastic windows and some wooden ones. The attic in the main building is finished. The spatial layout of the school includes: Ground floor - kitchen, dining room, emergency control center, classrooms; 1st floor - classrooms; 2nd floor - classrooms; Attic - unfinished. The school currently serves 211 students in grades 1 to 4 across 10 classes, with a staff of 23 teachers, 1 secretary, 1 caretaker, 1 cleaner, and 1 cafeteria worker. The dimensions of the main building are: Length: 44.75 m x Width: 12.10 m = 541.48 m2; Extension: Length: 10.36 m x Width: 8.50 m = 88.06 m2; Workshop building: Length: 24.95 m x Width: 11.89 m = 296.66 m2; Total ground area = 926.20 m2, resulting in a gross floor area of 2,644.00 m2. Renovation measures completed by 2024 include: 2011 roof renovation, partial window replacement with plastic, installation of a steel staircase as a second escape route, 2010 restroom renovation, partial electrical installation renewal in the attic for one room in 2023, and partial floor covering renovation in the workshop room in 2024. The planned renovation starting in 2025 will include: - Renewal of sanitary facilities - Replacement of windows and doors - Installation of a modern heating system - Renewal of electrical installations - Upgrading lighting - Renewal of fire protection and safety systems - Emergency and escape route lighting, emergency lights - Fire doors - Fire alarm, intrusion alarm, smoke detection system, smoke detectors - Motion detectors and speaker systems - Locking systems - Painting and plastering work - Facade repair and painting - Tiling and flooring work - Pile and edge protection - Shading systems / sun protection - Photovoltaic system with battery storage - Data network, LAN, and WLAN - Acoustic treatment in hallways, stairwells, and classrooms - Elevator for barrier-free access, accessible restroom, guidance system for accessibility - Emergency alert system (emergency response system) - Furniture/IT equipment - Outdoor facilities. This investment project will be funded through the school construction funding guidelines from the state of Thuringia. The project was registered for program planning with the Thuringian Ministry of Infrastructure and Agriculture in 2024. The estimated gross costs according to DIN 276 are: KG 300 - Building, construction: 2,912,600 EUR; KG 400 - Building, technical systems: 1,295,500 EUR, including KG 410 - Wastewater, water, gas systems: 183,000 EUR; KG 420 - Heating systems: 323,800 EUR; KG 430 - Air handling systems: 43,300 EUR; KG 440 - High voltage systems: 486,000 EUR; KG 450 - Telecommunications and information technology systems: 148,300 EUR; KG 460 - Lifting systems: 111,100 EUR; KG 500 - Outdoor facilities: 725,100 EUR.

    Track record

    2 awards · 2 winners
    Thin record

    Only 2 prior awards here — too little to read.

    In engineering, LANDRATSAMT SCHMALKALDENMEININGEN has awarded 2 contracts to 2 suppliers.

    Who wins here
    1. Architekturbüro bgs Gössinger + Scharfenberg1× · 50%
    2. ARCHITEKTURBRO BGS GSSINGER SCHARFENBERG1× · 50%

    Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    Scaffolding Hire, Erection and Inspection Services Framework

    Falkirk Council seeks up to 10 scaffolding contractors (5 per lot) for a 4-year framework agreement worth approximately £4.22 million covering hire, installation and inspection services.

    est.£4,220,000Falkirk Council
    Published 25 Sept 2026
    Construction🇬🇧United Kingdom

    Scaffolding Supply, Installation and Inspection Framework Agreement

    Falkirk Council invites tenders for a 4-year framework agreement worth £4.22 million to provide scaffolding hire, installation, maintenance and inspection services for council housing properties.

    est.£4,220,000Falkirk Council
    Published 25 Sept 2026
    Construction🇬🇧United Kingdom

    X-Ray System Replacement at Bryn Beryl and Dolgellau Community Hospitals

    Seek contractors to replace x-ray systems and perform associated building works at two Welsh community hospitals under JCT contract terms.

    est.£269,510Betsi Cadwaladr University Health Board
    Published 25 Sept 2026
    OpenConstruction🇬🇧United Kingdom

    Electric Vehicle Charging Solutions for Streets - Market Engagement

    Rotherham Council is gathering supplier information on electric vehicle charging solutions for residents without off-street parking access.

    Rotherham Borough Council
    Published 25 Sept 2026
    Take action
    View on sourceTED

    Award notice and full record on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    487925-2025
    LS
    Buyer
    LANDRATSAMT SCHMALKALDENMEININGEN
    Sector
    Construction