This contract involves insulation work, specifically: 1. Insulation for sanitary pipes, including approximately 20 meters of aluminum-coated mineral wool shell for pipes with a diameter of 15 to 22 mm, and approximately 30 meters for pipes with a diameter of 28 mm. 2. Insulation for heating systems,
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In construction, SCHULVERBAND WIESENTHEID has awarded 3 contracts to 3 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
The contract involves demolition work in five phases, including: demolition of visible masonry (60 m²), aerated concrete (30 m²), drywall (85 m²), concrete cutting, creating openings for doors and windows, constructing reinforced concrete foundations for an outdoor staircase (8 m³), waterproofing, m
This contract involves the installation of suspended ceilings and drywall work. The scope includes: • 59 m² of drywall partition (150 mm thick) with a height of 3.65 m, constructed with two layers of 12.5 mm cement board, insulated with mineral wool, and supported by galvanized steel profiles (100 m
The PVC flooring contract involves the installation of approximately 161 square meters of PVC flooring. This includes both the delivery and installation of the flooring materials. Suppliers are invited to submit their bids for this construction project, which is managed by the Schulverband Wiesenthe
The project involves the supply and installation of various school furniture items for the Schulverband Wiesentheid. The required items include: 97 chairs, 40 student desks, 17 teacher desks, 1 round table, 4 triangular tables, 2 steel storage shelves (1m x 2m), 4 long wall tables (4m), 2 sofas (120
Opportunity to design and fitout the British Council's Penang office with reconfigured layout and new examination facilities.
Appoint a multidisciplinary design team to develop decarbonisation solutions for Historic England's national archive in Swindon through RIBA Stage 3, supporting net-zero targets by 2040.
Structural lintel replacement and lime render renewal for a heritage property in Maryport's conservation area.
Single contractor required to design and build 28 affordable homes with community facilities and football pitch in Solva, Pembrokeshire.