The Kempten University is planning the construction of the sixth phase of its development project. This phase includes new buildings primarily for engineering and social sciences, as well as central facilities. The project has been approved for a usable area of 8,106 m² and total costs of €151.1 mil
Tender closed on 21 Aug 2025. Awaiting award.
No single supplier dominates the field.
In engineering, STATE BUILDING AUTHORITY KEMPTEN has awarded 5 contracts to 5 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract involves the construction of a new administrative building for the Border Police Inspection in Lindau. The building will be designed using a wood-concrete hybrid construction method and will have a total usable area of 1,500 square meters. The project includes a basement and an additio
The Kempten State Building Authority is seeking suppliers for engineering and technical services related to mechanical and electrical engineering for the construction of a new building at Kempten University. This includes specialized planning for heating, cooling, ventilation, and sanitary systems,
This project involves the renewal of the data cabling in the former residence of Kempten, which was originally built as a Benedictine monastery in the Baroque style and is now a protected historical site. The building currently houses the District Court, the Local Court, and the Public Prosecutor's
This contract opportunity involves flooring works for the new construction of the State Office for Finance in Germany. The project includes approximately 740 square meters of radon-proof sealing, 2,700 square meters of PE film barrier, 2,700 square meters of EPS thermal insulation, 3,400 square mete
OFD Finnart requires inspection services, repair planning, and condition assessment for three industrial storage tanks to extend their operational lifespan.
Cork County Council is tendering for the supply, installation, and maintenance of electric vehicle chargepoints at council facilities throughout County Cork.
Two-year framework agreement for hydroacoustic river flow measurement instruments supporting flood risk management, climate resilience, and water resource monitoring across the UK.
Inland Fisheries Ireland seeks a multidisciplinary consultant to design and manage two fish passage barrier mitigation projects at bridges in County Mayo through feasibility and statutory consent phases.