This contract involves the design and construction of a high-efficiency gas cogeneration plant with a capacity of 7.4 MWe and 7.0 MWt in Malbork. The work includes the construction of electrical lines: a 15 kV line connecting the plant to the grid and a 110 kV line for power distribution. The contra
Tender closed on 28 Aug 2025. Awaiting award.
Gwynedd Council seeks suppliers to design, supply, and install grid-connected solar PV systems across 11 properties.
City College Plymouth is tendering for reliable electricity and gas suppliers to serve their multi-site campus with competitive pricing and strong sustainability commitment.
Install a 99kW rooftop solar panel system on the West Ham shop with inverters and electrical connections to the stadium network.
Galway County Council seeks a framework supplier for the design, installation, and maintenance of rooftop solar PV systems across their facilities.