MV Mannheimer Verkehr GmbH is seeking planning services for the expansion of the existing tram workshop located in building M5. The project includes planning phases 1 to 4, with optional phases 5 to 7. Suppliers are invited to submit proposals for these services, which are essential for enhancing th
Tender closed on 15 Aug 2025. Awaiting award.
No single supplier dominates the field.
In engineering, MV MANNHEIMER VERKEHR GMBH has awarded 4 contracts to 4 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract involves the demolition of the existing workshop building located at Heppenheimer Straße 31-33 in Mannheim-Käfertal. The demolition is necessary to make way for the construction of a new operational workshop in Käfertal. The total value of the contract is €1,500,000, and interested sup
This contract opportunity involves the planning and surveying services for the barrier-free upgrade of the Waldhof Train Station in Mannheim, Germany. The project is divided into two phases: Phase 1 includes planning services (stages 1-4), and Phase 2 (optional) includes additional planning services
The MV Mannheimer Verkehr GmbH is seeking services for the renewal of railway tracks in the direction of Heidelberg along the OEG line 9402, specifically between the Fernmeldeturm and Holbeinstraße. This project will be executed in two phases. The existing track structure, which consists of gravel t
This contract involves the procurement of planning services (phases 1 to 4, and optionally phases 5 to 7) for the M339 project, which focuses on expanding the existing tram workshop located in building M5 in Mannheim. Suppliers are invited to provide their expertise in architectural planning to supp
East West Railway Company is procuring a 12-year Integration, Technical, Operations, Assurance and Environmental Partner to deliver comprehensive support across five service pillars for the East West Rail major infrastructure project, with structural independence to ensure assurance integrity.
Yorkshire Water is procuring integrated laboratory sampling, analysis, and transport services for AMP9 to support water quality testing and compliance requirements.
Feasibility study to audit accessibility and active travel infrastructure at Esk Valley railway stations and schools, with community engagement and recommendations.
Rural Housing Association seeks an Integrated Design Team to redesign a 7-unit social housing scheme at Cashel Cross Garrison to meet social housing standards and planning requirements.