The Aresing School Association is constructing an extension building and a pavilion for the school cafeteria and all-day care at the Bishop Sailer Primary and Secondary School in Aresing. The base floors of the buildings will be made of reinforced concrete, while the upper floors will be built using
Tender closed on 12 Aug 2025. Awaiting award.
No single supplier dominates the field.
In construction, SCHULVERBAND ARESING has awarded 3 contracts to 3 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, LINDUM GROUP LIMITED, TARMAC TRADING LIMITED — the field to beat, or your route in as a partner.
The Aresing School Association is constructing an extension building and a pavilion for the Bishop Sailer Primary and Secondary School in Aresing. The base floors of the buildings will be made of reinforced concrete, while the upper floors will be constructed using timber. Visible wooden support str
The Aresing School Association is constructing an extension building and a pavilion for the Bishop Sailer Primary and Secondary School in Aresing. The base floors of the buildings will be made of reinforced concrete, while the upper floors will be constructed using timber. Visible wooden support str
The Aresing School Association is constructing an extension building and a pavilion for the Bishop Sailer Primary and Secondary School in Aresing. The base floors of the buildings will be made of reinforced concrete, while the upper floors will be constructed using timber. Visible wooden support str
Supply, installation, and servicing of navigation buoys and associated marine equipment in Donegal Bay, including removal of existing systems and deployment of new 1.2-meter diameter buoys.
Refurbishment and repair services required for sash windows at the Moyderwell building in Tralee, County Kerry.
Padstow Town Council invites expressions of interest from contractors for refurbishment of Community Hub roof and two toilet blocks, plus construction of new toilet facilities at Lawn's car park, with works scheduled for Q4 2026.
Refurbishment and single storey extension project for a residential home located on Rosary Road in Oldham.