    ContractsRomania – Electrical Installation Works – Modernization, Rehabilitation, and Improvement of Low Voltage Networks Managed by Delgaz Grid - Stage 1 – Preparation of Technical and Economic Documentation (Phase PTh+CS+DTAC+DDE), Supply of Products and Execution of Works - 8 Lots
    Awarded contract

    Romania – Electrical Installation Works – Modernization, Rehabilitation, and Improvement of Low Voltage Networks Managed by Delgaz Grid - Stage 1 – Preparation of Technical and Economic Documentation (Phase PTh+CS+DTAC+DDE), Supply of Products and Execution of Works - 8 Lots

    Status
    Awarded
    Published 8 Jul 2025

    The procurement involves the execution of works for the "Modernization, Rehabilitation, and Improvement of Low Voltage Networks Managed by Delgaz Grid - Stage 1 – Preparation of Technical and Economic Documentation (Phase PTh+CS+DTAC+DDE), Supply of Products and Execution of Works - 8 Lots", which i

    🇷🇴RomaniaPublished 8 Jul 2025· 1 years agoviaTED
    Status
    Awarded
    Published 8 Jul 2025

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Closing date
      Rolling
      No closing date published
    • Sector
      Construction
      Browse related listings
    • Location
      🇷🇴Romania

    Lifecycle

    Awarded

    Contract awarded. Originally published 1 years ago.

    8 July 2025
    Awarded — no open tender advertised

    Brief

    The procurement involves the execution of works for the "Modernization, Rehabilitation, and Improvement of Low Voltage Networks Managed by Delgaz Grid - Stage 1 – Preparation of Technical and Economic Documentation (Phase PTh+CS+DTAC+DDE), Supply of Products and Execution of Works - 8 Lots", which includes: A. Preparation of Technical and Economic Documentation (Phase PTh+CS+DTAC+DDE) B. Execution of works in the medium voltage network/transformation station:  New concrete transformation stations will be installed.  Power transformers will be replaced if necessary based on measurements and calculations.  Old medium voltage fuse frames will be replaced with new frames, including ZnO surge arresters.  Transformer platforms will be replaced or repaired if necessary.  Distribution boxes and general 0, 4 kV columns will be replaced, sized according to the power of the transformers, if applicable. If the distribution box is replaced, a separate ignition point for public lighting will be installed.  Grounding sockets will be measured/improved/installed to appropriate values.  All installations will be fully labeled according to IP-SSM 33 – Safety and/or Health Signage of Electrical Installations, of DELGAZ GRID. C. Execution of works in the low voltage network  Classic and under-sized, damaged, insulated conductors will be replaced with twisted conductors NFA2X 50 Ol-Al 3x95+2x25 mm², to meet current technical standards and DELGAZ GRID standardization.  Existing cracked, non-compliant poles will be replaced with new, appropriately sized poles, and where possible, they will be removed from private properties and placed in the public domain.  All tilted poles will be straightened.  Underground networks will be created in certain areas, in accordance with the requirements of urbanism certificates.  Distribution cabinets will be installed.  Circuits will be reconfigured by creating new circuits to fit within the accepted limits of voltage drops, if necessary.  Selectivity boxes will be installed to ensure protection against short-circuit currents and grounding.  Isolation boxes will be installed in case of looping with other circuits.  Inadequate grounding sockets will be measured/improved.  Grounding sockets of appropriate values will be installed.  Low voltage connections will be modernized throughout the station area, respecting the construction solutions presented in the technical solution for connections developed by DELGAZ GRID: SOT 17_A2 – Construction Solutions for Connections in the Case of Modernization and Repair Works.  All installations will be fully labeled according to IP-SSM 33 – Safety and/or Health Signage of Electrical Installations, of DELGAZ GRID.  Provisioning will be ensured during the works and for other additional works necessary to comply with the performance standard, Ord. 11/2016, regarding the duration of interruptions. D. Purchase and delivery of all materials and equipment necessary for the execution of all works. The procurement is divided into 8 (eight) lots, according to Chapter II.2 List of Lots.

    Track record

    2 awards · 2 winners
    Thin record

    Only 2 prior awards here — too little to read.

    In construction, DELGAZ GRID SA has awarded 2 contracts to 2 suppliers.

    Who wins here
    1. LUCRIS SERV1× · 50%
    2. SC INSTGAZ SRL1× · 50%

    Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

    More from DELGAZ GRID SA

    4 listingsView all →
    AwardedEnergy & Utilities🇷🇴Romania

    Smart Energy Meters and Data Concentrators

    This procurement opportunity is for the supply of smart energy meters and data concentrators as part of the expansion of the Smart Measurement System implemented by DELGAZ GRID S.A. The required equipment and services include: 1. Single-phase meters with 4G LTE CAT M NB1 and GPRS communication modul

    RON 178,990,000DELGAZ GRID SA
    Published 12 Feb 2026
    Construction🇷🇴Romania

    Electric Transformer Station Project – Design and Execution of Turnkey Work Including Material Supply

    This procurement opportunity involves the design and execution of a turnkey project for the modernization of 110 kV cells in various transformer stations operated by DELGAZ GRID S.A. The project is divided into three lots: Lot 1 focuses on the modernization of specific 110 kV cells in the Roznov sta

    est.RON 24,067,215DELGAZ GRID SA
    Published 26 Nov 2025
    Construction🇷🇴Romania

    Electric Transformation Station Project in Romania

    This procurement opportunity involves a comprehensive project for the modernization of the electricity network in Romania, specifically focusing on two lots. Lot 1 includes the design and execution of the Glăvănești transformation station, which encompasses the preparation of technical documentation

    est.RON 133,985,512DELGAZ GRID SA
    Published 25 Nov 2025
    Engineering🇷🇴Romania

    Electricity System Design Services in Romania

    DELGAZ GRID S.A. is seeking suppliers to provide design services for medium and low voltage electricity distribution networks in Moldova. This contract involves the preparation of design documents for investment and modernization works, including network reinforcement, rehabilitation of transformer

    DELGAZ GRID SA
    Published 28 Oct 2025

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    First Floor Fit Out Work at Waterdale, Doncaster

    Doncaster NHS Foundation Trust invites tenders for the fit out of the first floor at Waterdale CYP Service on the High Street.

    est.£2,100,000ROTHERHAM DONCASTER AND SOUTH HUMBER NHS FOUNDATION TRUST
    Published 4 Sept 2026
    Construction🇬🇧United Kingdom

    Haybridge Avenue Public Open Space and Playground Development

    Telford & Wrekin Council seeks a contractor to design and deliver a new multi-age playground and public open space at Haybridge Avenue.

    est.£60,000Borough of Telford & Wrekin
    Published 4 Sept 2026
    Construction🇬🇧United Kingdom

    Fire-Damaged Council House Repair and Refurbishment - Kirkby in Ashfield

    Nottinghamshire County Council seeks a local contractor to fully repair and refurbish a fire-damaged 3-bedroom council house in Kirkby in Ashfield, including all building, mechanical and electrical works.

    est.£60,000Ashfield District Council
    Published 4 Sept 2026
    Construction🇬🇧United Kingdom

    Gutter Cleaning and Roof Anchor Testing Services

    Trafalgar Housing Association requires ongoing gutter cleaning, roof inspections, and roof anchor testing services for their residential properties.

    est.£60,000Trafalgar Housing Association
    Published 4 Sept 2026
    Take action
    View on sourceTED

    Award notice and full record on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    445774-2025
    DG
    Buyer
    DELGAZ GRID SA
    Sector
    Construction