This contract involves the supply and installation of the SH2 superheater for the steam generator of Line 1 at the waste-to-energy plant located in Valmadrera. The work will be conducted on a 'turnkey' basis, meaning the supplier will be responsible for delivering a complete solution, including all
Tender closed on 18 Jul 2025. Awaiting award.
This is an open procedure for the procurement of heating oil. The contract is aimed at suppliers who can provide heating oil for public sector use. The total value of the contract is €468,860. Interested suppliers should submit their bids by October 27, 2025. For more details, please visit the contr
Silea S.p.A. is seeking suppliers for the sorting, shredding, transportation, and recovery of bulky urban waste (EER 20 03 07) collected from the municipalities that are members of Silea S.p.A. This contract (lot 3) involves providing essential waste management services to ensure proper disposal and
This contract involves the provision of services for sorting, shredding, transporting, and recovering bulky urban waste classified under EER code 20 03 07. The waste is collected from the member municipalities of Silea S.p.A. This opportunity is specifically for Lot 2 of the project. Suppliers are i
This contract involves the supply and installation of a static uninterruptible power supply (UPS) system for a waste-to-energy plant. The work includes replacing the existing UPS unit and integrating it with the current system. Suppliers are invited to provide their proposals for this project, which
Fully comprehensive lift maintenance service contract for passenger, goods, bed, and platform lifts at NHS hospital facilities including all parts, call-outs, and specialist cleaning.
Framework contract for supply, installation, maintenance and relocation of mobility aids including stairlifts, platform lifts and ceiling hoists for disabled residents.
Design and deploy an autonomous robotic perimeter patrol proof-of-concept using Spot technology to enhance critical infrastructure monitoring and reduce manual inspections.
Supply and commission an IEC 61850-compliant SCADA system to replace legacy control systems at a 400/33kV substation with site-wide master control and intelligent interlocking capabilities.