Skip to content
BidSonarBidSonar

Closed contract

Highway A2 Reconstruction Project

This contract involves the reconstruction of the A2 highway, specifically the section at the border of the Łódź and Mazowieckie provinces, focusing on the Konotopa junction (without the junction) to add an additional lane. The work will expand the width of each lane by 3.0 meters on the inner side,

Published 3 Jul 2025 · 1 year agoTED

Tender deadline passed on 8 Aug 2025.

View on sourceTED

Original closed notice on the publisher's site

Tender closed

8 Aug 2025

1 year ago

Contract value

Not disclosed

Source did not declare a figure

Sector

Construction

Browse related listings

Location

Poland

Publisher
Publications Office of the European Union
Record ID
436590-2025

Lifecycle

Tender closed on 8 Aug 2025. Awaiting award.

Closed
  1. Published3 Jul 20251 year ago
  2. Tender deadline8 Aug 202516 months ago

Brief

This contract involves the reconstruction of the A2 highway, specifically the section at the border of the Łódź and Mazowieckie provinces, focusing on the Konotopa junction (without the junction) to add an additional lane. The work will expand the width of each lane by 3.0 meters on the inner side, utilizing the existing wide central dividing strip. This will change the traffic configuration from 2 lanes in each direction to a target configuration of 2 lanes in one direction and 3 lanes in the other. The project area is located in the Mazowieckie province, covering the Żyrardów and Grodzisk districts, including the municipalities of Wiskitki, Baranów, Jaktorów, and Grodzisk Mazowiecki. Additionally, there are optional tasks for traffic organization adjustments at various intersections and nodes, as well as the implementation and maintenance of temporary traffic organization based on provided documentation. The contractor will also be responsible for the demolition and construction of culverts under the A2 highway in a specified section, following the project documentation provided by the contracting authority. All necessary works for the proper functioning of the highway must be completed in accordance with the contracting authority's requirements.

Track record

Open field. No single supplier dominates the field.

9 awards · 9 winners

In construction, GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS has awarded 9 contracts to 9 suppliers.

Who wins here

+3 more suppliers

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS

4 listingsView all

Construction of Expressway S12 in Poland

GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS

This contract involves the design and construction of the S12 expressway section from the Wieniawa junction (without junction) to the Radom Południe junction (with junction). Key tasks include: 1) Designing and constructing the expressway, including necessary engineering structures and safety device

ClosedConstructionPolandPublished 19 Feb 2026

Deadline 12 Mar 2026

Open in Construction

4 open listingsView all