The public procurement contract involves the production of commemorative large-diameter silver coins with a nominal value of 10,000 CZK, featuring the design of "St. Vitus, Wenceslas, and Adalbert Cathedral in Prague." These coins will have a patina finish and a stamped hologram, along with an embed
Tender closed on 7 Aug 2025. Awaiting award.
This contract involves ongoing supplies of ingredients and food products to support the catering operations of the Czech National Bank (ČNB). Suppliers will be required to deliver these goods as per the current needs of the bank, including transportation to the specified location. The specific requi
This contract involves the ongoing supply of selected standard ICT equipment for the Czech National Bank, tailored to their current needs. The contract includes the delivery of the equipment to the specified location, as well as the provision of related maintenance services and other associated serv
This contract involves ongoing deliveries of raw materials and food products to support the catering operations of the Czech National Bank (ČNB). Suppliers will be required to provide these goods based on the current needs of the bank, including transportation to the designated delivery location. Th
This public contract involves providing the technological infrastructure necessary for hosting and operating the website www.cnb.cz. The services include ensuring computing power in a cloud environment, backing up primary data to a backup location, protecting against cyber internet attacks, and ensu
Procurement and installation of a fibre laser cutter to enhance manufacturing productivity and reduce costs for defence programme support.
Submit your manufacturing capabilities and expertise for components and assemblies through the Atamis RFI portal.
Seeking manufacturing SMEs to join a framework agreement for supplying components and assemblies through the Atamis portal.
Supply and installation of a factory-built Adiabatic Compressed Air Energy Storage demonstrator plant meeting specified performance requirements for delivery by June 2028, with a budget of up to £1.6 million.