Skip to content
BidSonarBidSonar

Awarded contract

Reconstruction of the Chomutov-Kadaň-Prunéřov Railway Section

This project involves the reconstruction of the railway section from Chomutov (excluding) to Kadaň-Prunéřov (including). The goal is to improve infrastructure to ensure safe and reliable operations, reduce operational costs, comply with national and European technical legislation (especially interop

Published 1 Jul 2025 · 1 year agoTED

View on sourceTED

Award notice and full record on the publisher's site

Closing date

Not published

No closing date published

Contract value

CZK 3,271,995,916

CZK

Sector

Construction

Browse related listings

Location

Czech Republic

Publisher
Publications Office of the European Union
Record ID
427987-2025

Suppliers

5 suppliers

Lifecycle

Contract awarded. Originally published 1 year ago.

Awarded

1 July 2025

Awarded — no open tender advertised

Brief

This project involves the reconstruction of the railway section from Chomutov (excluding) to Kadaň-Prunéřov (including). The goal is to improve infrastructure to ensure safe and reliable operations, reduce operational costs, comply with national and European technical legislation (especially interoperability technical specifications), and minimize environmental impact (particularly noise pollution). Key objectives include implementing a D4 load class throughout the project, enhancing passenger comfort, and increasing safety through the construction of secure crossings and raising platform heights to 550 mm above track level. The project will be developed using Building Information Modeling (BIM) according to the BIM Protocol and its appendices. It encompasses a comprehensive section of the railway, including the construction of technological facilities that must meet current legislation and requirements for integration into remote control systems and ERTMS. The operational components will involve a comprehensive modernization of signaling technology with the aforementioned prerequisites. Additionally, the project anticipates modernization of the starting and ending points in separate constructions, ensuring future integration possibilities. The scope of the project includes: • construction according to the tender documentation, • preparation of construction execution documentation, • preparation of as-built documentation including the geodetic part. This public contract also includes providing assistance related to the project or its parts during the duration of the cooperation agreement, which may involve (but is not limited to) signaling equipment and operational applications linked to the signaling equipment, allowing the buyer to connect future needs to the delivered project components from other contractors/manufacturers. Further specifications of the public contract are detailed in other parts of the tender documentation.

Track record

Open field. No single supplier dominates the field.

9 awards · 9 winners

In construction, RAILWAY ADMINISTRATION STATE ORGANIZATION has awarded 9 contracts to 9 suppliers.

Who wins here

  1. IRCONSTRUCTION SRO1× · 11%
  2. TOMI REMONT AS1× · 11%
  3. CHLDEK TINTRA AS1× · 11%

+3 more suppliers

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from RAILWAY ADMINISTRATION STATE ORGANIZATION

4 listingsView all

Revitalization and Electrification of the Nýřany – Heřmanova Huť Railway

RAILWAY ADMINISTRATION STATE ORGANIZATION

This contract involves the construction of the "Revitalization and Electrification of the Nýřany – Heřmanova Huť Railway". The project includes ensuring publicity and will be developed using Building Information Modeling (BIM) according to the BIM Protocol and its appendices. The scope of work inclu

ClosedConstructionCzech RepublicPublished 11 Dec 2025

Deadline 9 Jan 2026

Czech Republic – Implementation of Software – Deployment of IdM System in the Railway Administration Environment

RAILWAY ADMINISTRATION STATE ORGANIZATION

This contract involves the delivery of the IdM application tool (solution), including its implementation and integration with relevant systems, along with testing, data migration, preparation of implementation analysis, creation of all operational and configuration documentation, training for admini

AwardedIT & SoftwareCzech RepublicPublished 10 Dec 2025

CZK 9,976,850

Construction Work for Railway Track Renewal

RAILWAY ADMINISTRATION STATE ORGANIZATION

This contract involves cleaning and replacing the gravel bed in the tracks and switches, as well as replacing switch components at the railway stations in Záboří nad Labem, Řečany nad Labem, and Přelouč. The work will take place between kilometers 306.700 and 344.491, including the replacement of sl

ClosedConstructionCzech RepublicPublished 4 Dec 2025

est.CZK 359,685,075Deadline 7 Jan 2026

Railway Track Maintenance – Machine Repair and Reprofiling of Switches for Prague 2025-2027

RAILWAY ADMINISTRATION STATE ORGANIZATION

This public procurement contract involves the machine repair and reprofiling of railway switches for the Railway Administration in Prague. The project aims to ensure the proper functioning and safety of railway operations by maintaining and upgrading the switch systems. Suppliers are invited to prov

AwardedTransport & LogisticsCzech RepublicPublished 23 Nov 2025

CZK 149,000,000

Open in Construction

4 open listingsView all