This contract involves the preparation of feasibility studies and technical projects for the replacement of pipelines, connections, and the establishment of new natural gas distribution systems in various localities (villages, communes, cities) across the counties of Alba, Arad, Bacău, Bihor, Bistri
Contract awarded. Originally published 1 years ago.
Only 1 prior award here — too little to read.
In engineering, DELGAZ GRID SA has awarded 1 contract to 1 supplier.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This procurement opportunity is for the supply of smart energy meters and data concentrators as part of the expansion of the Smart Measurement System implemented by DELGAZ GRID S.A. The required equipment and services include: 1. Single-phase meters with 4G LTE CAT M NB1 and GPRS communication modul
This procurement opportunity involves the design and execution of a turnkey project for the modernization of 110 kV cells in various transformer stations operated by DELGAZ GRID S.A. The project is divided into three lots: Lot 1 focuses on the modernization of specific 110 kV cells in the Roznov sta
This procurement opportunity involves a comprehensive project for the modernization of the electricity network in Romania, specifically focusing on two lots. Lot 1 includes the design and execution of the Glăvănești transformation station, which encompasses the preparation of technical documentation
DELGAZ GRID S.A. is seeking suppliers to provide design services for medium and low voltage electricity distribution networks in Moldova. This contract involves the preparation of design documents for investment and modernization works, including network reinforcement, rehabilitation of transformer
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.