This contract involves the supply of four self-propelled aerial work platforms equipped with a telescopic boom. The platforms must have a minimum working height of 20 meters and be mounted on a 4x2 chassis truck with a gross vehicle weight rating (GVWR) between 4.5 tons and 5.5 tons. The buyer for t
Contract awarded. Originally published 1 years ago.
No single supplier dominates the field.
In transport logistics, TAURON DISTRIBUTION SA BRANCH IN GLIWICE has awarded 4 contracts to 4 suppliers.
Across transport logistics, the most active winners are DENNIS EAGLE LIMITED, COMPASS MINERALS UK LTD, BALFOUR BEATTY CONSTRUCTION LTD — the field to beat, or your route in as a partner.
This contract involves the supply of a brand new self-propelled aerial work platform with a maximum working height of at least 45 meters. The platform must be mounted on a truck chassis with either a 6x6 or 8x6 drive system. Suppliers are invited to submit their bids for this equipment, which is ess
This contract involves the supply of current transformers, voltage transformers, and combined transformers for a voltage of 110kV. The goods are required by TAURON Dystrybucja S.A. in Gliwice. The quantity of transformers needed is specified in the tender documents. Suppliers interested in this oppo
This contract involves the delivery of two brand new self-propelled aerial work platforms with a telescopic boom and maneuvering section, as well as one brand new self-propelled aerial work platform with a articulated telescopic boom. The platforms must have a maximum working height of at least 20 m
Transport for Wales seeks temporary contingent labour providers across multiple specialisms to support infrastructure maintenance operations on the Core Valley Lines from September 2027 onwards.
Establishment and development of Longforth Farm Allotments with mandatory site preparation works and optional enhancements including car park, pathways, shed bases, and water infrastructure.
Mold Community Hospital seeks contractors for x-ray room replacement including system installation and building/mechanical/electrical works in a ground floor space with restricted access.
Deliver seven energy-efficient 4-bedroom family homes including one wheelchair-accessible unit on a constrained London infill site adjacent to Network Rail.