This contract involves preparation of a surface area of approximately 355 square meters, installation of an insulation composite system with polystyrene facade insulation, surface reinforcement, and mineral plaster for walls and ceilings covering about 400 square meters. Additionally, it includes th
Contract awarded. Originally published 1 years ago.
Only 2 prior awards here — too little to read.
In construction, BREISGAUHOCHSCHWARZWALD DISTRICT has awarded 2 contracts to 2 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract opportunity involves planning services for the construction of a Special Educational and Counseling Center (SBBZ) focused on intellectual development in Breisach-Niederrimsingen. The services required are in accordance with the HOAI (Fee Structure for Architects and Engineers). The tot
The Breisgau-Hochschwarzwald District is seeking suppliers for the delivery, installation, rental, and full-service support of A4 multifunction printer systems. This contract is valued at approximately €598,651.20. Suppliers are invited to provide comprehensive solutions that include not only the pr
This contract opportunity involves the installation of electrical systems at SZ Gundelfingen, located at Kandelstraße 47, 79194 Gundelfingen, Germany. The work includes the installation of distribution systems, laying systems, wiring systems, room installations, lighting and emergency lighting, cons
This contract involves the expansion of the existing voice alarm system at the vocational high school in Müllheim. The project aims to enhance safety measures by installing new alarm systems and antennas. Suppliers are invited to provide the necessary goods and services to complete this installation
Opportunity to design and fitout the British Council's Penang office with reconfigured layout and new examination facilities.
Appoint a multidisciplinary design team to develop decarbonisation solutions for Historic England's national archive in Swindon through RIBA Stage 3, supporting net-zero targets by 2040.
Structural lintel replacement and lime render renewal for a heritage property in Maryport's conservation area.
Single contractor required to design and build 28 affordable homes with community facilities and football pitch in Solva, Pembrokeshire.