BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesBrandPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsExcavator Parts for Surface Mining Equipment
    Awarded contract

    Excavator Parts for Surface Mining Equipment

    Awarded
    RON 1.7m
    Published 23 Jun 2025

    This contract opportunity is for the supply of bucket teeth for excavators used in mining operations. The products are essential for replacing worn-out sets of teeth to prevent premature damage to the buckets and to avoid cracks in the structural metal components. The estimated maximum value for the

    🇷🇴RomaniaPublished 23 Jun 2025· 1 year agoviaTED
    Awarded
    RON 1.7m
    Published 23 Jun 2025

    Decision brief

    4 fields
    • Contract value
      RON 1,728,000
      RON
    • Closing date
      Not published
      No closing date published
    • Sector
      Manufacturing
      Browse related listings
    • Location
      🇷🇴Romania

    Suppliers

    2 suppliers
    • ME
      MERIDIAN ELECTRO CONSTRUCT
    Lead contractor
  1. ME
    MERIDIAN ELECTRO CONSTRUCT
    Consortium partner
  2. Lifecycle

    Awarded

    Contract awarded. Originally published 1 year ago.

    23 June 2025
    Awarded — no open tender advertised

    Brief

    This contract opportunity is for the supply of bucket teeth for excavators used in mining operations. The products are essential for replacing worn-out sets of teeth to prevent premature damage to the buckets and to avoid cracks in the structural metal components. The estimated maximum value for the contract over a 12-month period is 3,372,840.00 lei, while the estimated minimum value is 2,023,920.00 lei. The estimated value of the largest subsequent contract is 1,944,000.00 lei. Suppliers have 18 days to request clarifications before the deadline for submitting offers. The contracting authority will respond to all requests for clarification in a single response, which will be provided 11 days before the submission deadline. Subsequent contracts will be issued every 3 months during the validity period of the framework agreement.

    Track record

    2 awards · 2 winners
    Thin record

    Only 2 prior awards here — too little to read.

    In manufacturing, OLTENIA ENERGY COMPLEX has awarded 2 contracts to 2 suppliers.

    Who wins here
    1. MERIDIAN ELECTRO CONSTRUCT1× · 50%
    2. COZMIRCOM1× · 50%

    Across manufacturing, the most active winners are GRENEVIA S A, GRENEVIA SA, KOMPAN LIMITED — the field to beat, or your route in as a partner.

    Ask an assistant

    ChatGPT · Claude

    Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

    • “Who has OLTENIA ENERGY COMPLEX awarded work like this to?”
    • “What else is OLTENIA ENERGY COMPLEX buying right now?”
    • Add to ChatGPT (opens in a new tab)
    • Add to Claude (opens in a new tab)

    BidSonar is free · sign in once

    More from OLTENIA ENERGY COMPLEX

    4 listingsView all →
    AwardedTransport & Logistics🇷🇴Romania

    Vehicle Rental for Goods Transport with Driver

    This contract involves the rental of industrial transport vehicles with drivers for continuous flow operations in lignite quarries. The work includes repairs, maintenance, and interventions on large-capacity lifting mechanisms. All services will be provided through rented vehicles from third-party s

    RON 1,824,680OLTENIA ENERGY COMPLEX
    Published 26 Feb 2026
    ClosedTransport & Logistics🇷🇴Romania

    Transportation Services for Employees

    This contract opportunity involves the procurement of transportation services to ensure the safe travel of employees from their homes to the workplace and back, in accordance with the collective labor agreement. Suppliers should note that any requests for clarification must be submitted at least 19

    OLTENIA ENERGY COMPLEX
    Published 23 Oct 2025
    AwardedManufacturing🇷🇴Romania

    Romania – Parts for Excavators – Components for Mining Machinery

    This procurement opportunity involves the purchase of parts necessary for maintaining the technical condition of the mobility systems of mining machinery. These parts will be used in current repair work (level L.N.-3.1 and L.N.-3.2) or in case of accidental interventions carried out by the company's

    RON 861,120OLTENIA ENERGY COMPLEX
    Published 13 Oct 2025
    AwardedConstruction🇷🇴Romania

    Equipment Rental for Construction and Public Works in Romania

    This contract involves the rental of construction machinery and equipment, including operators, for various public works projects. The work includes essential tasks for lignite extraction, such as leveling and terracing work steps, operating large excavators, managing coal deposits, cleaning and lev

    RON 45,534,431OLTENIA ENERGY COMPLEX
    Published 11 Sept 2025

    Open in Manufacturing

    4 open listingsView all →
    Manufacturing🇬🇧United Kingdom

    SCADA-Based Mine Environmental Monitoring and Control System Installation at National Coal Mining Museum

    Design, supply, and commission a SCADA-based environmental monitoring system at the National Coal Mining Museum across two financial years (2026/7-2027/8) with a total project value of approximately £95,000.

    est.£95,000NATIONAL COAL MINING MUSEUM FOR ENGLAND TRUST LTD
    Published 13 Nov 2026
    OpenManufacturing🇬🇧United Kingdom

    Fens and Lincolnshire Reservoir Programme: Supply Chain Market Engagement

    Anglian Water is engaging suppliers to understand market capability, capacity, and constraints for delivering two major reservoir projects in the East of England through Market Sounding Questionnaires starting November 2026.

    ANGLIAN WATER SERVICES LIMITED
    Published 13 Nov 2026
    Manufacturing🇬🇧United Kingdom

    Helium Compressor Package Supply for STFC Daresbury Laboratory

    Supply and installation of a helium compressor package matching existing specifications at STFC Daresbury Laboratory.

    est.£290,000UK Research & Innovation (UKRI)
    Published 13 Nov 2026
    Manufacturing🇬🇧United Kingdom

    Nitric Oxide Therapy Supply Contract for NHS Scotland

    NHS Scotland seeks experienced suppliers for nitric oxide therapy products and services across its health facilities.

    est.£2,104,188The Common Services Agency (more commonly known as Public Services Delivery Scotland) (PSD Scotland)
    Published 13 Nov 2026
    Take action
    View on sourceTED

    Award notice and full record on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    402539-2025

    Your fit

    Could you win the next one?

    This went to MERIDIAN ELECTRO CONSTRUCT. Sonar reads OLTENIA ENERGY COMPLEX's work like this against your business — who holds it, and whether you could compete or partner next time.

    Check my fit

    Free · Matches every Monday

    OE
    Buyer
    OLTENIA ENERGY COMPLEX
    Sector
    Manufacturing