This contract involves the supply, installation, testing, and commissioning of five (5) new Direct Current Fields with a power switch on a sliding frame and an electronic protection unit for the switch. These will be installed at five (5) substations on Line 1 of the STASY S.A. Specifically, the ins
Tender closed on 22 Jul 2025. Awaiting award.
This contract involves upgrading and modernizing the electronic and electromechanical equipment at the stations of lines 2 and 3 of STASY. Specifically, the tender includes: A) the supply and installation of a complete and integrated control and management system for the controlled parking areas at
This contract involves the supply of multi-use ticket rolls required for the operation of the Automatic Fare Collection System (AFCS). Specifically, the tender is for the 'multi-use ticket' in roll form, with detailed specifications and technical characteristics outlined in Annex I 'Description of P
This contract involves the supply of multi-use ticket rolls required for the operation of the Automatic Fare Collection System (AFCS). Specifically, the tender is for the 'multi-use ticket' in roll form, with detailed specifications outlined in Annex I 'Description of Physical & Economic Object' of
This contract involves the procurement of various spare parts for the braking system and pneumatic system of trains operating on lines 1, 2, and 3 of the STASY network. The total value of the contract is approximately €2,480,208. The opportunity is open to suppliers who can provide the necessary com
Develop a strategic plan for deploying £50 million to decarbonise the Liverpool City Region bus fleet across five depots using zero-emission vehicles and charging infrastructure.
Engage a certified Decontamination Authorising Engineer to provide expert oversight and authorization of decontamination operations and compliance.
Theatre Royal Plymouth seeks a multi-disciplinary engineering team to support capital programme delivery for two major projects.
Welsh Government invites qualified contractors to perform a comprehensive three-dimensional topographical survey of a 170.62-hectare Baglan Bay site, with deliverables including digital ground models and CAD drawings, commencing January 2027 for three months.