Temporary polygonal roof building required for LDT blade repair facility operations.
Contract awarded. Originally published 3 months ago.
Only 1 prior award here — too little to read.
In construction, ORE Catapult has awarded 1 contract to 1 supplier.
Across construction, the most active winners are SPECIALIST COMPUTER CENTRES PLC, PORTAKABIN LIMITED, Allerton Damp Proofing Limited — the field to beat, or your route in as a partner.
ORE Catapult is seeking an experienced marine surveying contractor to undertake a survey campaign in the Pembrokeshire Demonstration Zone, Wales.
Direct award for extended hire and resources to install a hub inching drive system at LDT facility.
Direct award for supply and installation of a Vaisala WindCube 2.1 XP lidar profiler system at the NOAH facility as part of an asset upgrade project.
Direct award consultancy position to support the IUK Workforce Development Hub project with specialist expertise and strategic guidance.
Appoint a multidisciplinary design team to develop decarbonisation solutions for Historic England's national archive in Swindon through RIBA Stage 3, supporting net-zero targets by 2040.
Structural lintel replacement and lime render renewal for a heritage property in Maryport's conservation area.
Single contractor required to design and build 28 affordable homes with community facilities and football pitch in Solva, Pembrokeshire.
Yorkshire Water is establishing a framework for comprehensive ozone plant maintenance, minor capital works, technical support, and emergency response services across its treatment facilities.