Temporary polygonal roof building required for LDT blade repair facility operations.
Contract awarded. Originally published 1 months ago.
Only 1 prior award here — too little to read.
In construction, ORE Catapult has awarded 1 contract to 1 supplier.
Across construction, the most active winners are PORTAKABIN LIMITED, SPECIALIST COMPUTER CENTRES PLC, CDW LIMITED — the field to beat, or your route in as a partner.
Opportunities to supply waste management and recycling services across nine specialized lots including shredding, electronics, liquids, metals, hazardous waste, and general waste disposal.
Direct award contract for emergency wind turbine blade repair services, including crane-based personnel access and technical supervision to resolve a critical blade failure incident.
Design and install a weatherproof demountable enclosure for the ORE Catapult PQ Test Facility in Blyth.
Provide on-site and remote technical support for control systems and hardware in blade testing facilities.
RBGE invites qualified contractors to design and install specialist interpretative displays for the Palm Houses exhibition spaces.
St Albans City and District Council is conducting pre-market engagement to gather supplier feedback and refine requirements for the William Bird Community Hub project.
Multi-lot framework agreement for the supply of water industry fittings across five specialized product categories with sizes ranging from 80mm to 1200mm.
Leeds College of Building seeks a Principal Contractor to manage the design and refurbishment of the CTEC Building in Leeds.