BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesBrandPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsWestbrook Weir Flood Risk Modelling and Design
    Awarded contract

    Westbrook Weir Flood Risk Modelling and Design

    Awarded
    £81.7k
    Published 6 Oct 2025

    The Environment Agency is looking for a contractor to conduct flood risk modelling and outline design work related to the removal of the Westbrook Mill weir on the River Wey. **Project Overview** The Westbrook Mill has been operational for around 300 years, but the mill and its associated factory

    🇬🇧United KingdomPublished 6 Oct 2025· 1 years agoviaContracts Finder
    Awarded
    £81.7k
    Published 6 Oct 2025

    Decision brief

    4 fields
    • Contract value
      est.£81,663
      Pounds sterling
    • Tender closed
      12 Sept 2025
      1 years ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇬🇧United Kingdom

    Suppliers

    1 supplier
    • WU
      WSP UK LIMITED
    Lead contractor

    Lifecycle

    Awarded

    Contract awarded. Originally published 1 years ago.

    6 Oct 2025Today12 Sept 2025

    Brief

    The Environment Agency is looking for a contractor to conduct flood risk modelling and outline design work related to the removal of the Westbrook Mill weir on the River Wey. **Project Overview** The Westbrook Mill has been operational for around 300 years, but the mill and its associated factory have been closed for many years, resulting in minimal heritage significance. The weir features six sluice gates, each 1.5 meters wide, and has a height difference of 1.3 meters between the upstream and downstream levels. The upstream water level is maintained at 1.6 meters above the weir sill. The structure includes cast concrete walls and a central pier extending under a road bridge, providing access to a parking area. An access walkway is also present over the weir, which is manually operated. The upstream channel is confined by steel sheet pile walls for about 50 meters, and there are three overspill weirs that direct water into the Hell Ditch, which rejoins the main river approximately 3 kilometers downstream. In 2016, a fish pass was installed at the upstream overspill weir to facilitate fish migration past the Catteshall and Westbrook weirs. This project aims to assess the flood risks associated with the weir and develop designs for its removal, ensuring environmental considerations and community safety are prioritized.

    More from ENVIRONMENT AGENCY

    4 listingsView all →
    AwardedResearch & Innovation🇬🇧United Kingdom

    Evidence Review of Direct Air Carbon Capture Technologies and Best Available Techniques

    Commission an evidence review on Best Available Techniques for Direct Air Carbon Capture to support future environmental permitting decisions.

    £62,645ENVIRONMENT AGENCY
    Published 9 Oct 2026
    AwardedResearch & Innovation🇬🇧United Kingdom

    Develop Flood Risk Reduction Metrics for Properties

    Develop a methodology and metric to measure how flood defense investments reduce flood risk to properties across England's FCERM programme.

    £63,918ENVIRONMENT AGENCY
    Published 9 Oct 2026
    AwardedResearch & Innovation🇬🇧United Kingdom

    Water System Investment Metrics Development

    Develop metrics and data tools to measure and communicate the benefits of nature-based solutions for water system resilience and corporate co-funding.

    £34,916ENVIRONMENT AGENCY
    Published 9 Oct 2026
    AwardedConstruction🇬🇧United Kingdom

    River Slea Ground Investigations and Environmental Services Engineering

    Ground investigation and environmental services contract for the River Slea project progressing through OBC-FBC stages via CDF Lot 2.

    £264,493ENVIRONMENT AGENCY
    Published 9 Oct 2026

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    British Council Penang Office Reconfiguration and Exam Facility Fitout

    Opportunity to design and fitout the British Council's Penang office with reconfigured layout and new examination facilities.

    British Council
    Published 10 Oct 2026
    OpenConstruction🇬🇧United Kingdom

    Design Team for Swindon Archive Building Decarbonisation (RIBA Stage 3)

    Appoint a multidisciplinary design team to develop decarbonisation solutions for Historic England's national archive in Swindon through RIBA Stage 3, supporting net-zero targets by 2040.

    est.£149,000HISTORIC ENGLAND LIMITED
    Published 9 Oct 2026
    Construction🇬🇧United Kingdom

    Lintel Replacement and Rendering Work at 4 John Street, Maryport

    Structural lintel replacement and lime render renewal for a heritage property in Maryport's conservation area.

    est.£30,000STORM TEMPEST LTD
    Published 9 Oct 2026
    Construction🇬🇧United Kingdom

    Design and Build 28 Affordable Homes in Solva, Pembrokeshire

    Single contractor required to design and build 28 affordable homes with community facilities and football pitch in Solva, Pembrokeshire.

    est.£6,080,000ateb Housing Group Ltd
    Published 9 Oct 2026
    Take action
    View on sourceContracts Finder

    Award notice and full record on the publisher's site

    Publisher
    UK Cabinet Office
    Licence
    OGL v3.0
    Source
    contractsfinder.service.gov.uk
    Record ID
    3b38e84b-a298-417e-88ee-33a5a62ef3b9

    Your fit

    Could you win the next one?

    This went to WSP UK LIMITED. Sonar reads ENVIRONMENT AGENCY's work like this against your business — who holds it, and whether you could compete or partner next time.

    Check my fit

    Free · Matches every Monday

    EA
    Buyer
    ENVIRONMENT AGENCY
    Sector
    Construction