This contract opportunity is for the procurement of electrodes, divided into 5 lots, as specified in the attached technical specifications document. Suppliers are required to submit their technical proposals based on these specifications. Suppliers can request clarifications until 18 days before the
Tender closed on 16 Jul 2025. Awaiting award.
This contract opportunity is for the procurement of sanitary materials, specifically categorized into 12 lots, as detailed in the specifications document. Suppliers are required to submit their technical proposals based on these specifications. Suppliers can request clarifications up to 13 days befo
This procurement opportunity is for the supply of renal dialysis consumables and the provision of two dialysis machines at no cost. Suppliers are invited to submit technical proposals based on the specifications outlined in the attached documentation. Clarifications can be requested up to 18 days be
This contract involves the supply of biological sample collection systems according to the specifications outlined in the tender documentation. Suppliers must prepare their technical proposals based on these requirements. Suppliers can request clarifications up to 18 days before the submission deadl
This contract is for the supply of orthopedic prosthetics, divided into 41 lots, according to the specifications outlined in the tender documentation. Each supplier must prepare a technical proposal based on these requirements. Suppliers have 18 days to request clarifications before the deadline for
Calderdale Borough Council seeks quotations for designing and installing an air source heat pump system at Brighouse Swimming Pool to replace gas heating as part of the Public Sector Decarbonisation Scheme.
Green hydrogen supply meeting ISO 14687:25 standards with equipment and services for multiple applications across Highland Council.
Access up to £5.8 million in UKRI funding to scale-up new automotive and aerospace manufacturing technologies over 2-4 years, with support covering 80% of full economic costs.
Access up to £4.5 million in UK funding over 60 months to build a network accelerating manufacturing innovation scale-up in aerospace, automotive, and advanced manufacturing sectors.