BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsEngineering Services for Reconstruction of Culverts in Ujsoły Forest District
    Closed contract

    Engineering Services for Reconstruction of Culverts in Ujsoły Forest District

    Tender closed
    3 Jul 2025
    14 months ago

    This contract involves the following: 1. Under the basic order, the contractor will prepare design and cost documentation, including necessary opinions, agreements, and decisions for the reconstruction of five culverts. This will include replacing concrete pipe culverts with prefabricated arch culve

    🇵🇱PolandPublished 4 Jun 2025· 1 years agoviaTED
    Tender closed
    3 Jul 2025
    14 months ago
    Tender deadline passed on 3 Jul 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      3 Jul 2025
      1 years ago
    • Sector
      Engineering
      Browse related listings
    • Location
      🇵🇱Poland

    Lifecycle

    Closed

    Tender closed on 3 Jul 2025. Awaiting award.

    4 Jun 2025Today3 Jul 2025

    Brief

    This contract involves the following: 1. Under the basic order, the contractor will prepare design and cost documentation, including necessary opinions, agreements, and decisions for the reconstruction of five culverts. This will include replacing concrete pipe culverts with prefabricated arch culverts made of galvanized steel in the Ujsoły Forest District. The contractor must handle all administrative agreements and obtain necessary permits and decisions as required by law, according to the detailed description in Annex 1 to the Terms of Reference. 2. Under the optional order, the contractor may provide author supervision over the construction works based on the design documentation mentioned in point 2.1.1.1. The buyer has the right to declare the use of the option or part of it during the contract period. The buyer may choose not to use the option or to use it partially, and the contractor will have no claims against the buyer in this regard. The buyer anticipates the possibility of using the option, provided that financial resources are secured in the project "Comprehensive Project for the Adaptation of Forests and Forestry to Climate Change - Small Retention and Prevention of Water Erosion in Mountain Areas - Continuation" (MRG3), corresponding to the scope of the option activated in the case of awarding the contract for construction works based on the design documentation mentioned in point 2.1.1.1.

    More from STATE FORESTS NATIONAL FOREST HOLDING UJSOY FOREST DISTRICT

    1 listingView all →
    AwardedEngineering🇵🇱Poland

    Engineering Services for Land and Water Projects in Poland

    This contract involves the preparation of design and cost documentation for the reconstruction of five culverts in the Ujsoły Forest District. The work includes replacing concrete culverts with prefabricated steel arch culverts, obtaining necessary administrative approvals, and ensuring compliance w

    STATE FORESTS NATIONAL FOREST HOLDING UJSOY FOREST DISTRICT
    Published 14 Jul 2025

    Open in Engineering

    4 open listingsView all →
    OpenEngineering🇬🇧United Kingdom

    Hot Cell Integration and Unified Ventilation System

    Integration of 5 hot cells (3 legacy and 2 new) into a single nuclear-compliant ventilation system for the Materials Recovery Facility.

    UK ATOMIC ENERGY AUTHORITY
    Published 21 Aug 2026
    Engineering🇬🇧United Kingdom

    A816 Bealach Mor Permanent Road Solution - Consultant Services

    Argyll and Bute Council seeks a consultant to manage the A816 Bealach Mor landslip project from temporary repairs to permanent road solution through business case development and construction preparation.

    Argyll and Bute Council
    Published 21 Aug 2026
    Engineering🇬🇧United Kingdom

    Water Temperature Monitoring and Inspections for Legionella Control

    Provide water temperature monitoring and Legionella inspections across Lancashire County Council sites in either the North or South region, ensuring HSE compliance.

    est.£1,755,000LANCASHIRE COUNTY COUNCIL
    Published 21 Aug 2026
    Engineering🇮🇪Ireland

    Private Water Supply Sampling and Analysis Contract - County Wexford

    Wexford County Council invites tenders for compliance sampling and analysis services for approximately 170 private and group water supplies under EU drinking water regulations.

    WEXFORD COUNTY COUNCIL
    Published 21 Aug 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    363712-2025
    SF
    Buyer
    STATE FORESTS NATIONAL FOREST HOLDING UJSOY FOREST DISTRICT
    Sector
    Engineering