This contract involves the removal, transportation, and external valorization of sewage sludge from wastewater treatment plants in Asturias. The sludge will be treated through aerobic digestion at the Composting Plant located at the COGERSA Waste Treatment Center in Serín, Gijón. Suppliers are invit
Tender closed on 4 Jul 2025. Awaiting award.
This contract opportunity involves the supply of hydraulic hoses specifically designed for industrial vehicles, public works machinery, and production plants operated by COGERSA. The total value of the contract is approximately €431,907.52. Suppliers interested in this opportunity should note that t
This contract opportunity involves the provision of preventive and corrective maintenance services, as well as the supply of spare parts for HIAB cranes on the trucks used by Cogersa's selective waste collection fleet. Suppliers are invited to submit proposals for these essential services to ensure
This contract opportunity involves the provision of preventive and corrective maintenance services, as well as the supply of spare parts for industrial burners installed at the production plants of Cogersa and Proygrasa in the CTR of Serín. Suppliers are invited to submit proposals for these essenti
This contract involves the supply and installation of urban proximity clean points in municipalities across the Principality of Asturias. The project is funded by the European Union under the NextGenerationEU initiative, as part of Spain's Recovery, Transformation, and Resilience Plan. Suppliers are
Topographical and utility survey services required to support detailed design of the Mountmellick Flood Relief Scheme project.
Confidential waste destruction and disposal services for the GMC's sensitive materials and documents, requiring compliance with strict information security policies.
The EPA is seeking a contractor to conduct independent air emissions monitoring at licensed industrial sites in Ireland from 2027-2029 to verify operator compliance and maintain environmental standards.
Design and develop a nature-based solutions catchment management plan for the Hollyford area to reduce flood risk, improve water quality, and provide implementation guidance with cost-benefit analysis.