The contract involves providing construction supervision services for the project of building facilities to offer residential care for adults with intellectual disabilities in the village of Atia. The contractor will be responsible for overseeing the construction process until the project is complet
Tender closed on 10 Jul 2025. Awaiting award.
Construction of an adapted ground floor cloakroom and WC facility for a vulnerable tenant at a Blyth residential property, scheduled to begin November 2026 over 14 weeks.
Design-and-build glazed envelope and structural steelwork renewal for the Grade II listed Barbican Arts Centre, including new glazing systems, steel framing, and façade access solutions across multiple building sections.
EKFB requires a subcontractor for trial installation of access stairs and hard landscaping at Claydon Road Overbridge, with potential for future phases if successful.
Supply and install Flexipave footpath and dropped kerbs at Tarka Leisure Centre to specification.