This contract involves masonry work for the transformation of the EMS de l'Orme facility. The project aims to achieve performance equivalent to the Minergie ECO Extended standard. Key details include: - Floor area: 4,464 m² - Net area: 3,931 m² - Reference energy area: 3,991 m² - Built volume: 13,26
Contract awarded. Originally published 1 year ago.
No single supplier dominates the field.
In construction, ORME FOUNDATION AAPA SA has awarded 8 contracts to 8 suppliers.
+2 more suppliers
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
Add BidSonar to the assistant you already use, then ask it about this notice in plain English.
BidSonar is free · sign in once
This contract involves the installation of false floors as part of the transformation project for the EMS de l'Orme facility. The building is expected to meet the Minergie ECO Extended standard. Key details include: - Total floor area: 4,464 m² - Usable area: 3,931 m² - Energy reference area: 3,991
This contract involves the installation of wooden flooring as part of the transformation project for the EMS de l'Orme facility. The building is expected to meet the Minergie ECO Extended standard. Key details include: - Total floor area: 4,464 m² - Usable area: 3,931 m² - Energy reference area: 3,9
This contract involves the installation of windows as part of the transformation project for the EMS de l'Orme facility. The building is expected to meet the Minergie ECO standard for energy efficiency. Key details of the project include: - Total floor area: 4,464 m² - Usable area: 3,931 m² - Energy
Worcester City Council seeks an experienced contractor for a 12-week refurbishment of Barrington House, with mandatory site visit attendance required before tender submission.
Southend-on-Sea City Council seeks contractors to design and build a specialist resource base for pupils with EHCPs at Earls Hall Primary School.
National Oceanography Centre seeks suppliers of reverse osmosis units and water purification equipment for research and operational use.
Integrated supply team sought to deliver new 730-pupil post-primary school with enabling works and demolition at St Conor's College in Kilrea.