The Technical University of Nuremberg (UTN) is being developed on a 37-hectare site in southern Nuremberg. The first phase includes five founding buildings (GGB), divided into three construction measures (TBM). The third TBM involves the construction of the Quantum Engineering (QE) laboratory buildi
Tender closed on 20 Jun 2025. Awaiting award.
This contract involves construction work for both building and civil engineering projects. The scope includes the demolition of concrete paving and asphalt, along with the removal of existing floor slabs. It also entails creating trenches, some of which will require external shoring against existing
This contract involves extensive metal construction and repair work in coordination with other construction companies on site. The work includes repairs to steel-glass facades, steel windows, and doors, which involves tasks such as deglazing, stripping paint, reinforcing supports, applying new coati
The project involves construction work including the demolition of concrete paving and asphalt, along with their bedding layers. It also includes the removal of existing floor slabs, creating trenches, and core drilling through sandstone walls. The work will involve formwork and concrete pouring, in
This contract opportunity involves the construction of laboratory buildings in Germany, specifically focusing on tile work. The project requires various types of waterproofing and tiling services, including: - **Waterproofing**: - W0-I: Polyurethane-based, chemical-resistant for approximately 3
Rehabilitation and repair project for 12 bridges on regional and local roads across water courses in County Westmeath during 2026.
Central Bedfordshire Council invites contractor applications for housing repairs and void property works on its social housing portfolio.
Council seeks experienced contractor to maintain pool water treatment systems, chemical dosing, UV systems and moveable floor at Jubilee2 leisure facility from October 2029.
Milton Keynes City Council seeks market views on procurement strategy for flood alleviation and surface water management schemes, with construction planned from Q4 2026.