The contract involves the supply of stainless steel materials to the buyer, Kopalnia Soli "Wieliczka" S.A. The supplier is required to deliver these materials in batches, as requested by the buyer, over the duration of the contract. The materials must comply with CE market regulations and be deliver
Tender closed on 2 Jul 2025. Awaiting award.
The contract involves the sale of electricity to the facilities of the Wieliczka Salt Mine. The supplier will provide a maximum of 16,000 MWh of electricity, distributed across four connection points. The electricity must be sourced entirely from renewable energy sources, and the supplier is require
The contract involves the sale of electricity to the facilities of the Wieliczka Salt Mine. The supplier will provide electricity through the distribution network of TAURON Dystrybucja S.A. The total maximum amount of electricity to be purchased is 16,000 MWh, distributed across four connection poin
This contract involves the sale and delivery of standard light sources (light bulbs) to the buyer, Kopalnia Soli "Wieliczka" S.A. The supplier is required to provide electrical materials that are approved for circulation in the internal market (CE). Detailed specifications, including the types, para
This contract involves the sale and delivery of specialized electric light sources that are approved for circulation in the European market. The supplier is required to provide these materials as part of the contract. Detailed specifications, including the types, parameters, and quantities of the re
Fully comprehensive lift maintenance service contract for passenger, goods, bed, and platform lifts at NHS hospital facilities including all parts, call-outs, and specialist cleaning.
Framework contract for supply, installation, maintenance and relocation of mobility aids including stairlifts, platform lifts and ceiling hoists for disabled residents.
Design and deploy an autonomous robotic perimeter patrol proof-of-concept using Spot technology to enhance critical infrastructure monitoring and reduce manual inspections.
Supply and commission an IEC 61850-compliant SCADA system to replace legacy control systems at a 400/33kV substation with site-wide master control and intelligent interlocking capabilities.