Construction of Târgu Neamț - Iași - Ungheni Highway, Section 2: Târgu Frumos - Letcani
The investment objective of the Târgu Neamț – Iași – Ungheni Highway is to create a modern communication route that connects Section 2 of the Ditrău – Târgu Neamț highway at Moțca (km 0+000) and extends eastward to the connection with the Prut River Bridge at Ungheni. Section 2, from Târgu Frumos to
The investment objective of the Târgu Neamț – Iași – Ungheni Highway is to create a modern communication route that connects Section 2 of the Ditrău – Târgu Neamț highway at Moțca (km 0+000) and extends eastward to the connection with the Prut River Bridge at Ungheni. Section 2, from Târgu Frumos to Letcani, begins at km 31+500, where it connects with Section 1 of the Târgu Neamț (Moțca) – Târgu Frumos highway. The highway route from km 31+500 to km 40+000 runs north of DN28, passing through the localities of Războieni, Valea Oilor, and Balțați, intersecting with DC117 and DC116. At km 40+000, due to the terrain and landslide risks, a tunnel is proposed using the cut-and-cover method to minimize the construction footprint and ensure continuity of a local agricultural access road. From km 40+000 to km 47+000, the highway intersects with DC115. The highway continues north of Podu Iloaiei, where a trumpet interchange will be constructed at km 50+100 to connect the highway with DN28 west of Podu Iloaiei. After Podu Iloaiei, the highway bypasses a reservoir, intersects DJ281 and DJ282D, and between km 53+500 and 54+340, it will connect with the Gherăieşti-Iași gas network (Fir I, II) and the Gherăieşti-Lețcani DN 700 (planned pipeline). To connect the highway with the Municipality of Iași, a northwest interchange near Lețcani is proposed to facilitate access to the western part of Iași, connecting with national road DN28 and the Bypass VO28D via a connecting road. The length of Section 2 of the highway is 28.60 km, the connecting road to DN 28 (4-lane road) is 7.677 km long, and the connecting road to DN 28D (2-lane road) is 5.23 km long. Suppliers can request clarifications until 25 days before the bid submission deadline. The contracting authority will respond to clarifications on the 12th day before the bid submission deadline. The contracting authority will only respond to clarification requests submitted by economic operators by the established deadline.
Ask an assistant
Add BidSonar to the assistant you already use, then ask it about this notice in plain English.
The investment objective of the Târgu Neamț – Iași – Ungheni Highway aims to create a modern communication route to connect section 2 of the Ditrău – Târgu Neamț highway at Moțca km 0+000, extending from West to East to the connection with the Bridge over Prut at Ungheni. Section 4 DN24 (Iași) – Vam
ClosedConstruction🇷🇴RomaniaPublished 30 Dec 2025
est.Unusually high — likely a framework ceiling or publisher error. Shown as recorded from the source notice.Deadline 26 Jan 2026
This contract involves supervision services for the project "Târgu Mureș - Târgu Neamț Highway - Section II: Miercurea Nirajului - Leghin - Lot 2A: Ditrău - Grințieș". The highway route spans 37.9 km across the Mureș and Harghita counties. Suppliers have 18 days to request clarifications before the
The contracting authority is conducting this procurement procedure to acquire consultancy services, which include project management, work supervision, health and safety coordination, and training for the beneficiary staff, as part of the "Bacău – Piatra Neamț Express Road Project." Suppliers can re
This contract involves the provision of supervision services for the project "Design and Execution of the Târgu Mureș - Târgu Neamț Highway - Section II: Miercurea Nirajului - Leghin - Lot 2C: Pipirig - Vânători Neamț (Leghin)". The highway route spans 19.3 kilometers in Neamț County, including the
Swindon Borough Council seeks qualified providers to install LED lighting and wiring at Fessey House residential care facility with a contract value of £40,000 over 4 years.
Comprehensive external maintenance, repair, and redecoration services for building exteriors and communal areas, including surveys, design, installation, and asbestos management.
Open Dynamic Market framework for works and services procurement across 33 categories including construction, maintenance, retrofit and heritage projects.
OpenConstruction🇬🇧United KingdomPublished 13 Nov 2026