This contract involves demolition and asbestos removal work covering approximately 2,344 square meters across various hangars in the ZAC Sector A area of Ambarès. Additionally, the project includes environmental cleanup, land clearing, tree removal, and drainage work. Suppliers are invited to submit
Contract awarded. Originally published 1 year ago.
No single supplier dominates the field.
In construction, AQUITANIS has awarded 5 contracts to 4 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves the construction of 22 social housing units and 1 commercial space located in Îlot B124-1 within the ZAC Bastide Niel area of Bordeaux. Specifically, this opportunity focuses on Lot 14, which pertains to the installation of photovoltaic systems. Suppliers are invited to submit
This contract involves the construction of green spaces and related infrastructure (VRD) at the Le Tertre / Bois Sauvage residence located in Le Taillan Médoc. The work is commissioned by the Aquitanis/LP Promotion procurement group. Suppliers are invited to submit proposals for this project, which
This contract involves the replacement of balcony guardrails and the cladding panels of the loggias on the upper levels of the Les Cyprès Residence in Cenon, France. The work is part of a construction project aimed at enhancing safety and aesthetics. Suppliers are invited to provide their proposals
This contract opportunity involves the replacement of mixed ECS heating generators for both individual and collective systems across five residential sites. Suppliers are invited to provide their services for the installation of heating, ventilation, and air conditioning systems. The work aims to en
The University of Birmingham seeks manufacturer proposals for replacement shower pod enclosure systems for Jarratt Hall residences, with submissions due by 12 November 2026.
Enabling works project for Exeter main operations featuring SWALE facility development, car park construction, and landscaping.
Install 52 new electric charging pedestals across 21 Broads locations between December 2026 and February 2027.
Supplier needed to design and install foul water drainage infrastructure systems at Samlesbury Enterprise Zone to support business operations.