    ContractsEngineering Services for Design and Supervision of Wastewater Treatment Plant Modernization
    Awarded contract

    Engineering Services for Design and Supervision of Wastewater Treatment Plant Modernization

    Awarded
    PLN 276k
    Published 15 May 2025

    This project involves designing and obtaining necessary opinions, agreements, approvals, and administrative decisions (including a valid building permit) along with accompanying documents and author supervision services for the following scope: a) expansion of the existing bar screen building; b) mo

    🇵🇱PolandPublished 15 May 2025· 1 years agoviaTED
    Awarded
    PLN 276k
    Published 15 May 2025

    Decision brief

    4 fields
    • Contract value
      PLN 276,000
      PLN
    • Closing date
      Rolling
      No closing date published
    • Sector
      Engineering
      Browse related listings
    • Location
      🇵🇱Poland

    Suppliers

    1 supplier
    • EL
      ECOKUBE LIMITED LIABILITY COMPANY
    Lead contractor

    Lifecycle

    Awarded

    Contract awarded. Originally published 1 years ago.

    15 May 2025
    Awarded — no open tender advertised

    Brief

    This project involves designing and obtaining necessary opinions, agreements, approvals, and administrative decisions (including a valid building permit) along with accompanying documents and author supervision services for the following scope: a) expansion of the existing bar screen building; b) modernization of the bar screen system by constructing a second independent bar screen cleaner (in the southern channel - left) with a track, along with adapting the existing cleaner's track for the northern channel (to ensure central discharge of screenings into a common container) and creating an evacuation system to raise both screens above the wastewater level in emergencies; c) modernization of the screenings collection and transport system to allow collection from both screens into one container (2.4 x 5.0 m) with a new container position and guides, adapting the existing cleaner's track for the northern channel, modernizing the floor (replacing the floor inside the building), creating a drainage for leachate from the container and floor to the existing inlet channel, and replacing the entrance gates to the hall; d) modernization of the existing cleaner (adapting it to the new operational layout); e) installation of necessary power and control systems for the cleaner and evacuation system; f) data transmission about the operational status of devices to the main control and visualization system; g) construction of a service platform for the screen in the southern channel with railings; h) covering channels to reduce wastewater evaporation before and after the screens, e.g., with easily removable covers connected to the air extraction system for the biofilter; i) relocating the existing automation cabinet of the cleaner; j) modernization of the building's external cladding (replacement of walls and roof); k) replacement of windows and doors with corrosion-resistant ones; l) modernization of corrosion protection for steel structures, including replacing the building's frame bracing, window and door joinery, gutters, etc.; m) adapting the roof safety system after the building's expansion; n) modernization of the ventilation system inside the bar screen building to reduce vapor emissions and improve the indoor atmosphere; o) modernization of other installations in the building, including water supply, sewage, heating, electrical, lighting, lightning protection, and grounding systems, along with necessary external installation upgrades for proper operation; p) installation of H2S, NH3, CH4, SO2 detectors in the bar screen building with local visual and audible alarms; q) adapting the road and communication system in connection with the building's expansion in relation to existing solutions. Ensure author supervision over the projects developed by the Contractor regarding: a) verifying compliance with the project during construction; b) agreeing on the possibility of introducing alternative solutions compared to those provided in the project, as proposed by the construction manager or investment supervision inspector; c) participation in the public procurement procedure for construction works.

    Open in Engineering

    4 open listingsView all →
    OpenEngineering🇬🇧United Kingdom

    Hot Cell Integration and Unified Ventilation System

    Integration of 5 hot cells (3 legacy and 2 new) into a single nuclear-compliant ventilation system for the Materials Recovery Facility.

    UK ATOMIC ENERGY AUTHORITY
    Published 21 Aug 2026
    Engineering🇬🇧United Kingdom

    A816 Bealach Mor Permanent Road Solution - Consultant Services

    Argyll and Bute Council seeks a consultant to manage the A816 Bealach Mor landslip project from temporary repairs to permanent road solution through business case development and construction preparation.

    Argyll and Bute Council
    Published 21 Aug 2026
    Engineering🇬🇧United Kingdom

    Water Temperature Monitoring and Inspections for Legionella Control

    Provide water temperature monitoring and Legionella inspections across Lancashire County Council sites in either the North or South region, ensuring HSE compliance.

    est.£1,755,000LANCASHIRE COUNTY COUNCIL
    Published 21 Aug 2026
    Engineering🇮🇪Ireland

    Private Water Supply Sampling and Analysis Contract - County Wexford

    Wexford County Council invites tenders for compliance sampling and analysis services for approximately 170 private and group water supplies under EU drinking water regulations.

    WEXFORD COUNTY COUNCIL
    Published 21 Aug 2026
    Take action
    View on sourceTED

    Award notice and full record on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    315322-2025
    Sector
    Engineering