The Logistics Center of Lower Saxony (LZN) is responsible for procuring goods and services for the immediate state administration of Lower Saxony. With the approval of its supervisory authority, LZN can also take on additional tasks for public law entities both within and outside the Lower Saxony st
Contract awarded. Originally published 1 years ago.
The Lower Saxony Water Management, Coastal Defense and Nature Conservation Agency (NLWKN) is conducting a statewide mapping of water structures in surface waters on behalf of the Lower Saxony Ministry of Environment, Energy, and Climate Protection. This contract involves mapping the water structures
This contract opportunity involves leasing six vehicles, specifically passenger cars, SUVs, or off-road vehicles with diesel engines, for government fire commanders. The lease term is strictly 60 months; proposals with different lease durations will be disqualified. The vehicles must be delivered as
The Niedersachsen State Office for Water Management, Coastal and Nature Conservation, located at Heinestraße 1, 26919 Brake, is seeking suppliers for sandbags to be used in the state sandbag reserve. Suppliers can find detailed information regarding the type and scope of the contract in the performa
The Logistics Center of Lower Saxony (LZN) is responsible for procuring goods and services for the immediate state administration of Lower Saxony. With the approval of its supervisory authority, the LZN can also take on additional tasks for public law entities both within and outside the Lower Saxon
Replace 3 chiller units on Diamond Building roof in Sheffield, including electrical infrastructure upgrades and associated supporting works.
Procurement of design and installation services for impermeable tank cover systems across approximately 24 water treatment sites to reduce process emissions as part of the Net Zero Investment Programme.
Framework for small civil engineering construction works at Ireland's Port of Waterford seeking qualified contractors.
Longford County Council seeks contractors to install box culverts and rehabilitate three county bridges through new construction, verge replacement, and riverbed clearing work.