BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesBrandPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsNew Surgical Center Construction in Augsburg
    Awarded contract

    New Surgical Center Construction in Augsburg

    Status
    Awarded
    Published 11 May 2025

    The Hessing Foundation is planning the construction of a new surgical center in Augsburg. The Hessing Clinics, established in 1868, are among the largest orthopedic facilities in Germany, performing over 6,000 surgical procedures annually. The current surgical center, built in the late 1960s, has un

    🇩🇪GermanyPublished 11 May 2025· 1 years agoviaTED
    Status
    Awarded
    Published 11 May 2025

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Closing date
      Rolling
      No closing date published
    • Sector
      Construction
      Browse related listings
    • Location
      🇩🇪Germany

    Suppliers

    1 supplier
    • EA
      ECKL ARCHITECTURE CLINIC PLANNING
    Lead contractor

    Lifecycle

    Awarded

    Contract awarded. Originally published 1 years ago.

    11 May 2025
    Awarded — no open tender advertised

    Brief

    The Hessing Foundation is planning the construction of a new surgical center in Augsburg. The Hessing Clinics, established in 1868, are among the largest orthopedic facilities in Germany, performing over 6,000 surgical procedures annually. The current surgical center, built in the late 1960s, has undergone continuous modernization but still reflects the medical standards of that era. The new surgical center will consist of three operating rooms and necessary ancillary spaces, designed for short inpatient surgeries and hybrid procedures. It will be strategically located near the emergency department to optimize patient flow. The project aims for high-quality, efficient planning, with a total area of approximately 822 m² and a volume of about 2,380 m³. Key milestones include the start of services in April 2025, construction beginning in December 2025, and completion by December 2026. The estimated total project cost is €6.77 million, with specific allocations for different construction categories. The contract will include comprehensive planning services for the building and interior, structural engineering, technical building services, medical technology consulting, fire protection consulting, and building physics consulting, with a phased approach to commissioning.

    Track record

    1 award · 1 winner
    Thin record

    Only 1 prior award here — too little to read.

    In engineering, HESSING FOUNDATION has awarded 1 contract to 1 supplier.

    Who wins here
    1. ECKL ARCHITECTURE CLINIC PLANNING1× · 100%

    Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    Global House Recladding and Refurbishment - Invitation to Tender

    DN Colleges Group invites tenders for the design and construction of recladding and refurbishment works to Global House at North Lindsey Campus.

    est.£3,500,000DN COLLEGES GROUP
    Published 29 Sept 2026
    Construction🇬🇧United Kingdom

    St Ives Crescent Sustainable Drainage System Installation

    Principal contractor required to install sustainable drainage systems and parking facilities at St Ives Crescent to reduce flooding and improve the local environment.

    est.£750,000NORTH EAST LINCOLNSHIRE BOROUGH COUNCIL
    Published 29 Sept 2026
    Construction🇮🇪Ireland

    Fire Safety Systems and WiFi-DAS Installation at Portiuncula University Hospital

    Design and install active fire safety systems and WiFi-DAS infrastructure at Portiuncula University Hospital, Ballinasloe.

    FCC Fire Cert Ltd.
    Published 29 Sept 2026
    Construction🇬🇧United Kingdom

    Antenatal Ward Renovation at Musgrove Park Hospital

    Renovation project to establish a new Antenatal ward facility in Block 14 of Musgrove Park Hospital.

    est.£1,200,000SOMERSET NHS FOUNDATION TRUST
    Published 29 Sept 2026
    Take action
    View on sourceTED

    Award notice and full record on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    299368-2025
    HF
    Buyer
    HESSING FOUNDATION
    Sector
    Construction