BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsRomania – Asphalt – Geogrid, Asphalt Mixtures and Quick Breaking Bitumen Emulsion EBCR 60 – 2 Lots
    Closed contract

    Romania – Asphalt – Geogrid, Asphalt Mixtures and Quick Breaking Bitumen Emulsion EBCR 60 – 2 Lots

    Tender closed
    22 May 2025
    15 months ago

    This procurement opportunity involves the purchase of Geogrid, Asphalt Mixtures, and Quick Breaking Bitumen Emulsion EBCR 60, which are necessary for restoring the asphalt surface of the road system, including heavy/light traffic roads, sidewalks, etc., in areas affected by the rehabilitation works

    🇷🇴RomaniaPublished 7 May 2025· 1 years agoviaTED
    Tender closed
    22 May 2025
    15 months ago
    Tender deadline passed on 22 May 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      22 May 2025
      1 years ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇷🇴Romania

    Lifecycle

    Closed

    Tender closed on 22 May 2025. Awaiting award.

    7 May 2025Today22 May 2025

    Brief

    This procurement opportunity involves the purchase of Geogrid, Asphalt Mixtures, and Quick Breaking Bitumen Emulsion EBCR 60, which are necessary for restoring the asphalt surface of the road system, including heavy/light traffic roads, sidewalks, etc., in areas affected by the rehabilitation works of the heating network related to SACET Bucharest. The procurement will be conducted through a framework agreement for each lot, specifically LOT I and LOT II, with a duration of 18 months from the date of signing, and will be concluded with a maximum of 3 economic operators. The supplied products must meet the requirements specified in the specifications document. The requested products are divided into two lots: LOT I – Geogrid; LOT II – Asphalt Mixtures and Quick Breaking Bitumen Emulsion EBCR 60. The specifications document outlines the minimum requirements of the contracting authority. The bidder guarantees that all products and materials to be purchased must comply with the requested requirements. Used or non-compliant products are not accepted. The standards mentioned in the specifications can be replaced with equivalent ones, and it is the bidder's responsibility to demonstrate equivalence if the supplied products comply with a standard equivalent to the one specified. Deadlines for submitting/responding to requests for clarifications/additional information: A. According to Article 160 paragraph (1) of Law no. 98/2016 on public procurement, as amended and supplemented, the deadline for any interested economic operator to request clarifications or additional information regarding the award documentation is a maximum of 18 days before the deadline for submitting offers. B. According to Article 160 paragraph (2) of Law no. 98/2016 on public procurement, as amended and supplemented, the contracting authority will respond clearly and completely to all requests for clarifications on the 11th day before the deadline for submitting offers. Responses will only be provided to clarification requests submitted by economic operators within the previously stated deadline. The purchase of the products will be carried out through a framework agreement for each lot, specifically LOT I and LOT II. The duration of the framework agreement will be 18 months from the date of signing, and it will be concluded with a maximum of 3 economic operators. Subsequent contracts related to the framework agreement will be signed quarterly and/or based on the needs of the contracting authority. The duration of the subsequent contracts will be a maximum of 4 months. Modifications to the framework agreement and subsequent contracts will be made during their validity period, in accordance with the provisions of Article 221 of Law no. 98/2016 in conjunction with the provisions of Instruction no. 1/2021 issued by ANAP.

    More from BUCHAREST MUNICIPAL ENERGY SERVICES COMPANY SA

    3 listingsView all →
    Manufacturing🇷🇴Romania

    Steel Procurement Contract

    This contract involves the purchase of BST 500S Class C rebar with diameters ranging from 8 mm to 28 mm, in accordance with the specifications outlined in the terms document no. 8291/26.06.2025. The procurement will be conducted through a contract that will last for 6 months from the date of signing

    est.RON 990,868BUCHAREST MUNICIPAL ENERGY SERVICES COMPANY SA
    Published 20 Aug 2025
    AwardedConstruction🇷🇴Romania

    Steel Procurement for Construction

    The procurement involves the purchase of BST 500S Class C reinforced steel bars with diameters ranging from 8 mm to 28 mm, as specified in the terms of reference document no. 8291/26.06.2025. The products will be acquired through a contract that will last for 6 months from the date of signing, and i

    BUCHAREST MUNICIPAL ENERGY SERVICES COMPANY SA
    Published 17 Aug 2025
    Construction🇷🇴Romania

    Steel Procurement Contract

    This contract involves the purchase of BST 500S Class C reinforced steel bars with diameters ranging from 8 mm to 28 mm, in accordance with the specifications outlined in the terms document no. 8291/26.06.2025. The procurement will be conducted through a contract that will last for 6 months from the

    est.RON 990,868BUCHAREST MUNICIPAL ENERGY SERVICES COMPANY SA
    Published 17 Jul 2025

    Open in Construction

    4 open listingsView all →
    OpenConstruction🇬🇧United Kingdom

    Distribution and Plant Framework Agreement for Network Rail Eastern Routes

    Network Rail is developing a framework agreement for distribution and plant services across Eastern routes, covering power, signalling, and electrical systems with a 5-year contract term.

    £48,000,000indicativeNETWORK RAIL INFRASTRUCTURE LIMITED
    Published 19 Aug 2026
    Construction🇬🇧United Kingdom

    Fire Safety, Fire Doors and Building Remediation Works Framework

    Multi-lot framework tender for fire safety, fire doors, and building remediation services across the UK, with contracts available for 4 years plus extended call-off options.

    EFFICIENCY EAST MIDLANDS LIMITED
    Published 19 Aug 2026
    Construction🇮🇪Ireland

    Emergency Drainage System Upgrade - Killocrim National School, Listowel, County Kerry

    Emergency drainage infrastructure overhaul for school including 1km foul drain diversion with pumping station, storm drain relocation, and electrical upgrades.

    est.€700,000Killocrim N.S.
    Published 19 Aug 2026
    Construction🇬🇧United Kingdom

    Liskeard Ambulance Station Refurbishment and Building Works

    SWAST is seeking a contractor to refurbish Liskeard Ambulance Station, including internal/external works, electrical upgrades, and new facilities, with a contract value of £320,000 and completion by end of 2026/27.

    est.£317,000SOUTH WESTERN AMBULANCE SERVICE NHS FOUNDATION TRUST
    Published 19 Aug 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    297306-2025
    BM
    Buyer
    BUCHAREST MUNICIPAL ENERGY SERVICES COMPANY SA
    Sector
    Construction