    ContractsConstruction of the Gubacsi Railway Bridge in Hungary
    Closed contract

    Construction of the Gubacsi Railway Bridge in Hungary

    Tender closed
    29 May 2025
    16 months ago

    This contract involves the construction of the Gubacsi Railway Bridge and its associated facilities (Phase I). The project includes building a railway bridge over the Soroksári-Duna branch, located 15 meters north of the current bridge. The bridge will carry the Bp. Soroksári Road - Csepel distribut

    🇭🇺HungaryPublished 7 May 2025· 1 years agoviaTED
    Tender closed
    29 May 2025
    16 months ago
    Tender deadline passed on 29 May 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      29 May 2025
      1 years ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇭🇺Hungary

    Lifecycle

    Closed

    Tender closed on 29 May 2025. Awaiting award.

    7 May 2025Today29 May 2025

    Brief

    This contract involves the construction of the Gubacsi Railway Bridge and its associated facilities (Phase I). The project includes building a railway bridge over the Soroksári-Duna branch, located 15 meters north of the current bridge. The bridge will carry the Bp. Soroksári Road - Csepel distribution railway line over the Danube, intersecting at the railway section 25+65.966 hm. The railway track between the Gubacsi Railway Bridge and the Corvin junction will be developed as a double-track network, with future possibilities for a four-track electrified setup. The existing Védgát Street crossing will be retained and rebuilt. The new railway track will not allow for on-site switch adjustments, so the final signaling system must be installed as per the plans included in the procurement documents. The equipment will be placed in a container near the Soroksári Road organizer and the second track built on the Csepel side. Key parameters include: - Gauge: 1435mm standard gauge - Track speed: 40 km/h - Usable platform length: n.r. (no passenger trains will operate) - Axle load: 22.5 tons - Usable train length: 740m - Track length: 750m - Clearance: according to MSZ 8691 'Av' Structure parameters: - Span: 22.00 + 145.00 + 22.00 m, clear span: 20.90 + 141.80 + 20.90 m - Obstacle crossed: Soroksári-Duna branch, intersecting at railway section 25+65.966 hm - Total structural length: 192.60m (including riverbed bridges) - Superstructure length: 493.60m - Superstructure: - Bank bridges: rigid reinforced concrete slab - Riverbed bridge: network arrangement, cable-suspended, orthotropic steel track structure 'basket-arched' bridge - Foundation: necessary foundations must be prepared for the bridge - Railway superstructure: - 54 E5 system rail, 1:20 rail slope - GEO reinforcement - effective ballast thickness: 50 cm - Column foundations must be prepared for future overhead wire design - Bridge inspection car: required - Monitoring system installation required Crossing: - A level crossing secured with traffic lights, with a rubber element crossing at railway section 29+80.05. A detailed execution plan package has been prepared as part of the project preparation, but the winning bidder will be responsible for preparing all other necessary plans (e.g., signaling systems, construction technologies, detailed plans) due to the complexity of the construction technologies, obtaining necessary declarations and approvals, and conducting other necessary consultations and obtaining permits during the construction process. The contracting authority (Client) must actively participate in official procedures for obtaining commissioning, traffic, and occupancy permits as necessary due to reasons not attributable to the contracting authority. The detailed description of the works covered by this procurement procedure is included in the procurement documents.

    More from MINISTRY OF CONSTRUCTION AND TRANSPORT

    4 listingsView all →
    Construction🇭🇺Hungary

    Railway Construction Project in Hungary

    This contract involves the construction work for the railway section between Debrecen and Nyíregyháza, including track laying, structures, and related facilities. The project is being offered under a contractual agreement and aims to enhance transportation infrastructure in the region. Suppliers are

    est.HUF 199,998,892,944MINISTRY OF CONSTRUCTION AND TRANSPORT
    Published 12 Feb 2026
    Construction🇭🇺Hungary

    Construction Works for Railway Safety Systems

    This contract opportunity involves the design and construction of safety systems, telecommunications, and ERTMS (European Rail Traffic Management System) for the railway line section between Kőbánya-Kispest and Ócsai vineyards to Kecskemét. Suppliers are invited to submit proposals for these essenti

    MINISTRY OF CONSTRUCTION AND TRANSPORT
    Published 17 Dec 2025
    Construction🇭🇺Hungary

    Railway Construction Project in Hungary

    This contract involves the installation of signaling systems, telecommunications, and the European Train Control System (ETCS) for the railway section between Debrecen and Nyíregyháza. The work is to be carried out under a contractual agreement, and suppliers are invited to submit their proposals. T

    est.HUF 60,552,850,253MINISTRY OF CONSTRUCTION AND TRANSPORT
    Published 30 Nov 2025
    AwardedEnergy & Utilities🇭🇺Hungary

    Engineering Services for Water Utilities

    This contract involves a framework agreement for engineering and technical supervision services related to water utility projects, following FIDIC standards. Suppliers are invited to provide expertise in managing and overseeing engineering tasks to ensure the successful execution of these projects.

    HUF 190,197,690MINISTRY OF CONSTRUCTION AND TRANSPORT
    Published 30 Oct 2025

    Open in Construction

    4 open listingsView all →
    OpenConstruction🇬🇧United Kingdom

    Skipton and Selby Leisure Wellbeing Hubs - Market Engagement

    Council seeks market input on leisure and wellbeing hub improvements for Selby and Skipton as part of a phased investment strategy.

    £2,500,000indicativeTHE NORTH YORKSHIRE COUNCIL
    Published 25 Sept 2026
    Construction🇬🇧United Kingdom

    Montrose Port Berths 9-10-11 Quay Construction Project

    Montrose Port invites experienced contractors to design and construct a new quay with hardstanding, utilities, and dredging at Berths 9-10-11.

    est.£35,000,000Montrose Port Authority
    Published 25 Sept 2026
    OpenConstruction🇬🇧United Kingdom

    Leisure and Wellbeing Hub Development – Market Information Request

    The Council invites suppliers to provide market insights on potential solutions for improving two leisure and wellbeing hub facilities as part of a phased investment strategy.

    £9,900,000indicativeTHE NORTH YORKSHIRE COUNCIL
    Published 25 Sept 2026
    Construction🇮🇪Ireland

    Windows and Doors Replacement Project - Kenmare Area Office and Family Resource Centre

    Tender for replacement windows and doors at the Kenmare Area Office and Family Resource Centre in County Kerry, Ireland.

    Kerry County Council
    Published 25 Sept 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    297282-2025
    MC
    Buyer
    MINISTRY OF CONSTRUCTION AND TRANSPORT
    Sector
    Construction