Rhein-Neckar-Verkehr GmbH (RNV) is expanding its transition from diesel-powered buses to those with alternative drives at the Ludwigshafen depot. To achieve climate neutrality, the existing charging infrastructure needs to be enhanced by increasing the number of charging points. Currently, there are
Contract awarded. Originally published 1 years ago.
Only 2 prior awards here — too little to read.
In engineering, RHEINNECKARVERKEHR GMBH has awarded 2 contracts to 2 suppliers.
Across engineering, the most active winners are DRIBO SPOL S RO, BRODOMERKUR ENERGETIKA d.o.o., BRODOMERKUR ENERGETIKA DOO — the field to beat, or your route in as a partner.
This contract involves the procurement and maintenance of essential spare parts, specifically the slewing ring, for the Variobahn RNVx train type. The total value of the contract is approximately €203,295. Suppliers are invited to provide the necessary materials to ensure the operational efficiency
Rhein-Neckar-Verkehr GmbH (rnv) is conducting a market exploration to assess future electricity procurement options. The objectives include: - Gathering information on current procurement models and pricing structures - Identifying innovative solutions for supplying traction power, operating depots,
Rhein-Neckar-Verkehr GmbH is seeking suppliers to provide external indicators for the Variobahn system. This procurement is part of a project to enhance control, safety, signaling, and lighting equipment. The total value of the contract is €760,000. Interested suppliers should refer to the tender do
Rhein-Neckar-Verkehr GmbH is seeking a maintenance and repair contract for traffic light systems installed by Yunex Traffic (formerly Siemens). The contract involves regular maintenance of the traffic light systems within the Rhein-Neckar public transport area, with maintenance scheduled at interval
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.