This contract involves the provision of repair and maintenance services for road weather station equipment. The supplier will be required to offer the complete scope of services as outlined in the procurement. The deadline for submissions is June 9, 2025, and the contract is published on the TED pla
Tender closed on 9 Jun 2025. Awaiting award.
This contract opportunity involves the preparation and oversight of a reconstruction project for a section of National Road No. 110, specifically from 1.720 km to 7.160 km, located between Švenčionys and Adutiškis. Suppliers are invited to provide engineering design services, which include project p
This contract opportunity involves the preparation and oversight of a major repair project for a section of National Road No. 191, specifically from 21.482 km to 25.382 km, located between Paliūniškis and Vabalninkas in Lithuania. Suppliers are invited to provide engineering design services, which i
This contract involves the major renovation of a state significance regional road, specifically sections 4.800 to 11.500 km of Regional Road No. 2212 from Klaipėda to Radailiai to Kretinga. The work includes the construction of bicycle paths, installation of lighting, and implementation of engineeri
This contract involves the reconstruction of a section of State Road No. 173, specifically the stretch between 15.405 km and 17.925 km, located between Molėtai and Pabradė. The project aims to improve the road's condition and safety for public use. Suppliers are invited to submit proposals for the n
Teesside International Airport is recruiting a taxi service provider to deliver passenger ground transportation with guaranteed 15-minute maximum wait times and future hydrogen vehicle capability.
Doncaster Council seeks two ranked suppliers for a 48-month framework agreement to provide heavy commercial vehicle parts and consumables with estimated annual spend of £50,000.
Southern Water seeks fuel card services for a 1200-vehicle fleet with annual fuel costs of £2 million.
Translink seeks suppliers to provide and install a replacement Brush Box assembly and high-pressure water Dust Suppression System for railway ballast regulators, including full installation and technical support for a 12-month contract with possible extensions.