Closed contract

Construction of Primary Schools in Germany - New Primary School North - Children's Campus - Interior Work

Tender closed
23 Jun 2025
14 months ago

The project involves the construction of a new primary school building that will serve as a northern boundary for the site while opening up to the south with an inviting design. The architecture of the school and sports hall is layered and calm, creating a backdrop to the slope and forming a spaciou

GermanyPublished 4 May 2025· 1 years agoTED
Tender deadline passed on 23 Jun 2025.

Decision brief

4 fields
  • Contract value
    Not disclosed
    Source did not declare a figure
  • Tender closed
    23 Jun 2025
    1 years ago
  • Sector
    Browse related listings
  • Location
    Germany

Lifecycle

Closed

Tender closed on 23 Jun 2025. Awaiting award.

4 May 2025Today23 Jun 2025

Brief

The project involves the construction of a new primary school building that will serve as a northern boundary for the site while opening up to the south with an inviting design. The architecture of the school and sports hall is layered and calm, creating a backdrop to the slope and forming a spacious outdoor area with play and sports facilities. The simple floor plan inside allows for good orientation, with the entrance hall serving as a distribution zone that can connect to the dining hall. A large entrance staircase acts as a central, communicative element or forum, providing seating for performances. The all-day area, with its own outdoor courtyard on the ground floor, transitions to the adjacent sports hall, which includes changing areas in the basement. The sports hall foyer offers a separate outdoor access for evening use. Classrooms on the upper floors create spatial units with internal communication areas at the head of the building, while specialized classrooms are located in the center. Cut-out courtyards ensure good lighting and ventilation in the core area. The library serves as the central shared learning space, and freely arranged corridors provide areas for open communication and learning opportunities. The structural concept is a reinforced concrete skeleton with columns and flat ceilings. Stairwell cores provide stability. Most exterior and interior walls are non-load-bearing (high flexibility) and constructed as wood post-and-beam or wood-clad drywall constructions. The exterior escape balconies are designed as Isokorb constructions (reinforced concrete), with the first and second escape routes leading outside for fire safety reasons. The basement level recedes under the two-story part compared to the ground floor. The following services are to be provided: LOT 1: - Wooden wall coverings with partial acoustic perforation approximately 1700m² - Wooden ceiling coverings with acoustic perforation approximately 1000m² - Acoustic absorbers with felt surface approximately 700m² - Interior doors / object doors / system partition walls approximately 105 units - Built-in cabinets approximately 280 linear meters, height approximately 2.7m, depth 0.6-0.7m - Mobile partition walls approximately 90m² LOT 2 - Impact wall for sports hall approximately 335m² - Interior doors / object doors approximately 15 units - Wooden ceiling coverings with acoustic perforation approximately 375m².

Track record

4 awards · 4 winners
Open field

No single supplier dominates the field.

In construction, CITY OF TRAUNREUT has awarded 4 contracts to 4 suppliers.

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, PDP MECHANICAL & ELECTRICAL LIMITED — the field to beat, or your route in as a partner.

More from CITY OF TRAUNREUT

4 listingsView all →
AwardedConstructionGermany

Drywall Construction for New Primary School in Traunreut

The City of Traunreut is seeking suppliers for drywall construction services for a new primary school building, known as the Kinder Campus. The project involves creating interior and exterior spaces that are functional and inviting. Key tasks include constructing drywall partition walls and ceilings

€354,700CITY OF TRAUNREUT
Published 4 Nov 2025
AwardedConstructionGermany

Heating System Installation for New Primary School in Traunreut

This project involves the construction of the new Primary School Nord in Traunreut. The building will have three levels: a basement (UG), a ground floor (EG), and an upper floor (OG). The basement will include technical rooms for heating, ventilation, and air conditioning (HVAC) and electrical syste

€469,434CITY OF TRAUNREUT
Published 3 Nov 2025
AwardedConstructionGermany

Construction of New Primary School in Traunreut

This project involves the construction of the new Primary School Nord in Traunreut. The building will consist of a basement, ground floor, and upper floor. The basement will house technical rooms for heating, ventilation, and sanitation, various storage areas, and a gym with sanitary facilities. The

€537,046CITY OF TRAUNREUT
Published 19 Oct 2025
AwardedConstructionGermany

Construction of a New Primary School in Traunreut

The project involves the construction of a new primary school building, which will serve as a northern boundary for the site while opening up to the south with an inviting design. The architecture features layered and calm structures, creating a backdrop against the slope and forming a spacious outd

€2,111,625CITY OF TRAUNREUT
Published 6 Aug 2025

Open in Construction

4 open listingsView all →