Closed contract

Construction of Exhaust Extraction Systems for New Fire Station in Glückstadt

Tender closed
29 May 2025
15 months ago

The project involves the construction of a new fire station in Glückstadt, which will have 17 vehicle bays. Additionally, the design includes facilities and structures for a tunnel fire brigade to accommodate the planned tunnel for the Elbe crossing of the A20 highway between Drochtersen and Glückst

GermanyPublished 1 May 2025· 1 years agoTED
Tender deadline passed on 29 May 2025.

Decision brief

4 fields
  • Contract value
    Not disclosed
    Source did not declare a figure
  • Tender closed
    29 May 2025
    1 years ago
  • Sector
    Browse related listings
  • Location
    Germany

Lifecycle

Closed

Tender closed on 29 May 2025. Awaiting award.

1 May 2025Today29 May 2025

Brief

The project involves the construction of a new fire station in Glückstadt, which will have 17 vehicle bays. Additionally, the design includes facilities and structures for a tunnel fire brigade to accommodate the planned tunnel for the Elbe crossing of the A20 highway between Drochtersen and Glückstadt. The building will feature two ground-level vehicle halls arranged orthogonally, a two-story main building section, and a three-story head building section. This tender specifically seeks proposals for exhaust extraction systems. Detailed specifications and requirements can be found in the tender documents, particularly in the bill of quantities. Work is expected to commence according to the construction schedule.

More from CITY OF GLCKSTADT

4 listingsView all →
ConstructionGermany

Interior Door Installation for New Fire Station in Glückstadt

The project involves the construction of a new fire station in Glückstadt, which will include 17 vehicle bays. Additionally, the design accommodates facilities for a tunnel fire brigade in response to the planned tunnel for the Elbe crossing of the A20 highway between Drochtersen and Glückstadt. The

CITY OF GLCKSTADT
Published 16 Jun 2025
ConstructionGermany

Interior Door Installation for New Fire Station in Glückstadt

The project involves the construction of a new fire station in Glückstadt, which will include 17 vehicle bays. Additionally, the design accommodates facilities for a tunnel fire brigade, in response to the planned tunnel for the Elbe crossing of the A20 highway between Drochtersen and Glückstadt. Th

CITY OF GLCKSTADT
Published 18 May 2025
ConstructionGermany

Construction of Exhaust Extraction Systems for the New Fire Station in Glückstadt

This project involves the construction of a new fire station in Glückstadt, which will have 17 vehicle bays. Additionally, the design includes facilities and structures for a tunnel fire brigade to accommodate the planned tunnel for the Elbe crossing of the A20 highway between Drochtersen and Glücks

CITY OF GLCKSTADT
Published 12 May 2025
ConstructionGermany

Construction of Fire Station in Glückstadt

This contract involves the construction of a new fire station in Glückstadt, which will include 17 vehicle bays. The design accommodates a planned tunnel for the future Elbe crossing of the A20 highway between Drochtersen and Glückstadt, necessitating additional facilities for a tunnel fire brigade

CITY OF GLCKSTADT
Published 1 May 2025

Open in Construction

4 open listingsView all →