Romania – Construction of Wastewater Sewerage System – Technical Project Design Services and Technical Assistance during Execution
This project aims to establish and expand the sewerage network and the capacity of the wastewater treatment plant in the commune of Paunesti, specifically in the villages of Paunesti and Viisoare. The project includes: 1. Expansion of the sewerage network with pressure pipes, including pumping stati
Contract awarded. Originally published 1 year ago.
Awarded
1 May 2025
Awarded — no open tender advertised
Brief
This project aims to establish and expand the sewerage network and the capacity of the wastewater treatment plant in the commune of Paunesti, specifically in the villages of Paunesti and Viisoare. The project includes: 1. Expansion of the sewerage network with pressure pipes, including pumping stations and property connections. 2. Construction of wastewater pumping stations. 3. Expansion of treatment capacity with 2 modules, with a maximum daily capacity of 2x200 cubic meters. Key components of the project include: - Extension of the main sewerage pipe with pressure pipes made of PEID material, PN10, with diameters ranging from 50 to 75 mm, totaling 38,080 meters. - Service pipe from the pumping station to the main sewerage pipe, made of PEID material, SDR 17, PN10, with a diameter of 50 mm, totaling 3,410 meters. - Construction of 682 pumping stations, including prefabricated hydraulic installations with various specifications. - Gravitational connection pipes to properties made of PVC, with a diameter of 160 mm, totaling 6,800 meters. - Installation of 68 buried sectorization valves. - Retrofitting of 5 existing pumping stations. - Expansion of treatment capacity with 2 modules, with a maximum daily capacity of 2 x 200 cubic meters. Suppliers have 20 days to request clarifications before the deadline for submitting offers. The contracting authority will respond to all requests for clarification 12 days before the submission deadline.
Track record
Thin record. Only 1 prior award here — too little to read.
1 award · 1 winner
In construction, PAUNESTI COMMUNITY has awarded 1 contract to 1 supplier.
Phase 2 culvert replacement and garden restoration project at Peoples Gardens, Phoenix Park, requiring removal of collapsed infrastructure and installation of new precast systems with landscaping and playground equipment reinstatement.
Construction🇮🇪IrelandPublished 26 Nov 2026
Nominal value — the true amount was likely withheld by the publisher.Deadline 7 Dec 2026
Hull City Authority is seeking a demolition contractor to safely dismantle two city centre buildings while removing asbestos, protecting a heritage mural, and remediating contaminated ground.