This contract involves drywall construction work for a new clinic building that will connect to an existing main corridor. The project includes two underground levels and five above-ground levels, with a total gross volume of approximately 108,000 cubic meters according to DIN 277 standards. Key qua
Contract awarded. Originally published 1 year ago.
No single supplier dominates the field.
In construction, FRTH CLINIC has awarded 4 contracts to 4 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves the construction of a new clinic building (BT 6.1.1) with a total volume of approximately 108,000 m³, consisting of 2 underground and 5 above-ground floors, connected to the existing main line. Additionally, it includes the construction of a technical center (T2) with a volume
This contract involves the construction of a new clinic building (BT. 6.1.1) with a total volume of approximately 108,000 m³, consisting of 2 underground and 5 above-ground floors, connected to the existing main pipeline. Additionally, a new technical center (T2) will be built with a total volume of
This contract opportunity involves the supply and installation of curtains and curtain tracks for a new hospital building (Klinikum Fürth) in Germany. The project includes the construction of a building with a total volume of approximately 108,000 cubic meters, consisting of 2 underground and 5 abov
This contract involves the construction of a new clinic building (BT. 6.1.1) with a total volume of approximately 108,000 m³, consisting of 2 underground and 5 above-ground floors, connected to the existing main line. Additionally, it includes the construction of a technical center (T2) with a total
The University of Birmingham seeks manufacturer proposals for replacement shower pod enclosure systems for Jarratt Hall residences, with submissions due by 12 November 2026.
Enabling works project for Exeter main operations featuring SWALE facility development, car park construction, and landscaping.
Install 52 new electric charging pedestals across 21 Broads locations between December 2026 and February 2027.
Supplier needed to design and install foul water drainage infrastructure systems at Samlesbury Enterprise Zone to support business operations.